Site Report: AT&T Alascom TAPS Repeater Round Top
Site Name: | AT&T Alascom TAPS Repeater Round Top |
---|---|
Address: | ~60 Miles N of Glennallen, Glennallen, AK 99588 |
File Number: | 900.38.017 |
Hazard ID: | 4407 |
Status: | Cleanup Complete - Institutional Controls |
Staff: | IC Unit, 9074655229 dec.icunit@alaska.gov |
Latitude: | 62.803825 |
Longitude: | -145.317842 |
Horizontal Datum: | WGS84 |
![]() | ![]() |
![]() | ![]() |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
During several Environmental Assessments, petroleum contamination was discovered beneath the above ground storage tanks area, the Generator Module, and the Fuel Bladder Staging area.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
4/24/2007 | Site Added to Database | Site added to the database. | Mitzi Read |
7/18/2007 | Institutional Control Record Established | The institutional control established for the site are the following: 1. In the event the contaminated soil at the sites become accessible, AT&T and/or Alyeska Pipeline Service Company shall notify ADEC and prepare a soil management plan in accordance with 18 AAC 75.360. 2. Any proposed transport of soil or groundwater from these sites requires prior notification to (and approval from) ADEC in accordance with 18 AAC 75.325(i). | Deborah Williams |
7/18/2007 | Conditional Closure Approved | A conditional closure determination was made for this site. | Deborah Williams |
12/14/2011 | Institutional Control Compliance Review | IC review conducted and staff name changed to IC Unit. | Evonne Reese |
3/2/2016 | Institutional Control Compliance Review | IC compliance review conducted. Scheduled to send an IC reminder letter in the near future. | Nathan Maxwell |
4/13/2017 | Institutional Control Compliance Review | Follow-up IC compliance review conducted. Contacted ADNR to verify the current lessee of this property. Will issue a reminder letter once the lessee is confirmed. Reminder system set to check back in two months. | Kristin Thompson |
8/1/2019 | Institutional Control Compliance Review | An Institutional Controls reminder letter mailed to the RP on this date. | Mossy Mead |
3/19/2024 | Institutional Control Update | Special circumstance please include SAIL AND State Pipeline Coordinator's Office housed in the Division of Oil and Gas. DNR-SAIL added as affiliate (Office of Primary Responsibility). For DNR LAS information: ADL# 420682 | Jennifer McGrath |
7/9/2024 | Institutional Control Compliance Review | IC compliance review completed on this date. An IC reminder letter was e-mailed to the responsible party and cc’d to the landowner. The next review will be in five years’ time. | Gaige Robinson |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
DRO | Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation | Soil |
Control Type
Type | Details |
---|---|
CS Database Notation And Letter To Landowner/RP |
Requirements
Description | Details |
---|---|
Advance approval required to transport soil or groundwater off-site. | Standard condition. |
When Contaminated Soil is Accessible, Remediation Should Occur | In the event the contaminated soil at this site becomes accessible, AT&T and/or Alyeska Pipeline Service Company shall notify ADEC and prepare a soil management plan in accordance with 18 AAC 75.360. |
Movement or use of contaminated material (including on site) in a manner that results in a violation of the water quality standards is prohibited (18 AAC 70) | Standard condition. |
No associated sites were found.