Site Report: USFWS Becharof NWR King Salmon Facility
Site Name: | USFWS Becharof NWR King Salmon Facility |
---|---|
Address: | Fish and Wildlife Service Road, N Bank of Naknek River E of Eskimo Creek, King Salmon, AK 99613 |
File Number: | 2569.38.024 |
Hazard ID: | 4417 |
Status: | Active |
Staff: | Jenny Gates, 9072628203 jenny.gates@alaska.gov |
Latitude: | 58.681575 |
Longitude: | -156.673769 |
Horizontal Datum: | WGS84 |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
1) Historical petroleum releases from aboveground storage tank, September 1996, Housing Unit #28 2)2002 discovery of contamination from unknown source need characterization, Building 5. Contamination excavated in 2002. DEC did not review the WP. Just received report in 2021. The report indicated more site characterization was needed to delineate the plume. It may be under the building. At that time, the source was still unknown. 3) January 1999 release from aboveground storage tank at office trailer acknowledged by ADEC PPR program. March 1999 report documents excavation of contaminated soil, removal of nearby septic tank, and soil confirmation samples. PPR issued "no further action" in September 1999.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
4/30/2007 | Exposure Tracking Model Ranking | Initial ranking completed. | Mitzi Read |
4/30/2007 | Site Added to Database | Site added to the database. | Mitzi Read |
2/27/2017 | Update or Other Action | ADEC contacted FWS to request a site update. | Lisa Griswold |
3/1/2017 | Potentially Responsible Party/State Interest Letter | PRP letter sent to RP | Lisa Griswold |
5/12/2017 | Update or Other Action | Letter sent to RP notifying of site management transfer to Rodman and to send any new information on site to Rodman for review. | Lisa Griswold |
5/12/2017 | Update or Other Action | Site transferred to Rodman | Lisa Griswold |
4/30/2018 | Workplan Requested | Work plan request letter mailed to RP. Work plan due June 30, 2018. | Amy Rodman |
5/1/2019 | Meeting or Teleconference Held | USFWS staff and Fairbanks ADEC staff met at Fairbanks ADEC office. Work plan and reporting requirements, along with outstanding actions for USFWS sites also communicated. | Amy Rodman |
6/19/2019 | Document, Report, or Work plan Review - other | Two-page work plan comprised of three steps submitted to ADEC for addressing six USFWS contaminated sites. More substantial and separate work plans are needed for individual USFWS sites. | Amy Rodman |
11/27/2019 | Exposure Tracking Model Ranking | A new updated ranking with ETM has been completed for source area 75402 Historic Petroleum Release. | Amy Rodman |
8/13/2024 | Update or Other Action | DEC staff sent an email to the USFWS project manager inquiring about the status of cleanup at the following sites: USFWS Becharof NWR Island Bay Barrel Cache (Haz ID 1036), USFWS Becharof NWR King Salmon Facility (Haz ID 4417), USFWS Becharof NWR King Salmon Facility (Haz ID 23210), USFWS Kodiak NWR Triplex (Haz ID USFWS 27197), Tetlin NWR Small Arms Firing Range (Haz ID 26436), and USFWS Wollard House (Haz ID 26704). Cleanup at these sites has been stalled for several years. | Jamie McKellar |
Contaminant Information
Name | Level Description | Media | Comments |
---|
Control Type
Type | Details |
---|
Requirements
Description | Details |
---|
There are no documents for this site report.
No associated sites were found.