Site Report: USFWS Becharof NWR King Salmon Facility

Site Name: USFWS Becharof NWR King Salmon Facility
Address: Fish and Wildlife Service Road, N Bank of Naknek River E of Eskimo Creek, King Salmon, AK 99613
File Number: 2569.38.024
Hazard ID: 4417
Status: Active
Staff: Jenny Gates, 9072628203 jenny.gates@alaska.gov
Latitude: 58.681575
Longitude: -156.673769
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

1) Historical petroleum releases from aboveground storage tank, September 1996, Housing Unit #28 2)2002 discovery of contamination from unknown source need characterization, Building 5. Contamination excavated in 2002. DEC did not review the WP. Just received report in 2021. The report indicated more site characterization was needed to delineate the plume. It may be under the building. At that time, the source was still unknown. 3) January 1999 release from aboveground storage tank at office trailer acknowledged by ADEC PPR program. March 1999 report documents excavation of contaminated soil, removal of nearby septic tank, and soil confirmation samples. PPR issued "no further action" in September 1999.

Action Information

Action Date Action Description DEC Staff
4/30/2007 Exposure Tracking Model Ranking Initial ranking completed. Mitzi Read
4/30/2007 Site Added to Database Site added to the database. Mitzi Read
2/27/2017 Update or Other Action ADEC contacted FWS to request a site update. Lisa Griswold
3/1/2017 Potentially Responsible Party/State Interest Letter PRP letter sent to RP Lisa Griswold
5/12/2017 Update or Other Action Letter sent to RP notifying of site management transfer to Rodman and to send any new information on site to Rodman for review. Lisa Griswold
5/12/2017 Update or Other Action Site transferred to Rodman Lisa Griswold
4/30/2018 Workplan Requested Work plan request letter mailed to RP. Work plan due June 30, 2018. Amy Rodman
5/1/2019 Meeting or Teleconference Held USFWS staff and Fairbanks ADEC staff met at Fairbanks ADEC office. Work plan and reporting requirements, along with outstanding actions for USFWS sites also communicated. Amy Rodman
6/19/2019 Document, Report, or Work plan Review - other Two-page work plan comprised of three steps submitted to ADEC for addressing six USFWS contaminated sites. More substantial and separate work plans are needed for individual USFWS sites. Amy Rodman
11/27/2019 Exposure Tracking Model Ranking A new updated ranking with ETM has been completed for source area 75402 Historic Petroleum Release. Amy Rodman

Contaminant Information

Name Level Description Media Comments

Control Type

Type Details

Requirements

Description Details

There are no documents for this site report.

No associated sites were found.