Site Report: New Hope Community Church HHOT

Site Name: New Hope Community Church HHOT
Address: 2775 Tanana Loop Extension, Delta Junction, AK 99737
File Number: 120.38.012
Hazard ID: 4419
Status: Active
Staff: Rebekah Reams, 9074512144 rebekah.reams@alaska.gov
Latitude: 64.125011
Longitude: -145.704622
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

600 gallons of diesel fuel were released from an above ground home heating oil tank when the fuel line cracked due to shifting of the 1,000-gallon tank. The tank was located directly adjacent to a residential building. The spill is also located within 75 feet of a water well with a depth of 25 feet. The responsible party removed as much contaminated soil as possible without causing damage to the foundation of the house. It is estimated that ~60 cubic yards of contaminated soil were removed. The excavated soil was stockpiled on the site for remediation. An ADEC spill responder visited the site on April 19, 2007 and conducted field screening to locate the remaining contaminated areas. Four areas were located and samples were pulled for analysis. These samples yielded levels of diesel range organics (DRO) from 438 to 4,410 ppm; soil samples were not analyzed for BTEX. Drinking water samples indicated DRO at 0.56 mg/L, which is less than the drinking water action level; and BTEX constituents were non-detect. The excavated soil was piled on plastic tarps and the landowner added nitrogen, an enzyme solution, and turned it to enhance the remediation. The soil stockpile was spread on the property in 2013 without any testing. In 2016 The structure at the spill release site burned down. It is estimated that ~300 gallons of diesel remain under the foundation. The church was advised to draw periodic samples from the well to ensure that is is free of contamination.

Action Information

Action Date Action Description DEC Staff
5/11/2007 Spill Transferred from Prevention Preparedness and Response Program Site transferred by PERP staff Wesley Ghormley. Spill Date = 11/23/06; Spill No. 06309932701; Substance = Diesel; Quantity = 600 gallons; PERP File No. 120.02.023. Mitzi Read
5/17/2007 Site Added to Database Site added to the database. Mitzi Read
5/18/2007 Exposure Tracking Model Ranking Initial ranking completed. Mitzi Read
8/14/2008 Update or Other Action David Reed contacted ADEC. He will send a letter documenting deposition of the stockpile and latest drinking water sampling report (2007). Neal Everson
4/20/2009 Proposed Plan Owner contacted me. Stockpile needs spread next summer possible closure. Neal Everson
10/10/2013 Site Visit Visited site and hand delivered status update letter. Obtained new contact information and updated file. Waiting for clarification regarding stockpiled soil, status of the drinking water well, and vapor intrusion issues at the residence. Residence is currently being used as an occassional rental unit. Laurel Gale
12/10/2013 Update or Other Action Communication with Tom Porter of the Hope Community Church indicated the drinking water well at this site is no longer in use, Drinking water is provided from a well located 150 feet away. The structure on this property is currently used as rental property or for seasonal housing. The stockpile had been spread about 1 year ago. Janice Wiegers
12/11/2013 Update or Other Action Letter sent to Hope Community Church clarifying additional requirements. The letter indicated that groundwater delineation is required and evaluation of the vapor intrusion pathway should be completed. Details regarding the disposition of the contaminated soil stockpile were also requested. Janice Wiegers
3/7/2014 Update or Other Action Received call from Tom Porter regarding how to find a consultant to address the items in DEC's last correspondence. Janice Wiegers
1/6/2017 Update or Other Action DEC sent letter requesting a workplan for further investigation with a deadline of March 31, 2017. Letter indicated groundwater characterization and vapor intrusion evaluation needed, and requested details regarding location of stockpile which was reportedly already spread on the property. Janice Wiegers
2/27/2018 Meeting or Teleconference Held ADEC staff spoke with property manager of the New Hope Community Church. He indicated the church burned down about 2 years ago, and the nearest households are more than 100 yards away from source area. Laura Jacobs
4/30/2018 Update or Other Action Received call from Mr. Greenleaf regarding how to proceed with cleanup. Janice Wiegers
4/8/2019 Workplan Requested DEC requested site characterization work plan be submitted by June 1, 2019. Megan Roberts
5/23/2019 Workplan Requested Environmental consultant requested work plan deadline extension. DEC approved a new work plan deadline of July 1, 2019. Megan Roberts
7/2/2019 Document, Report, or Work plan Review - other DEC received a work plan describing soil characterization at the source area and where remediated soils were land spread. A water sample is to be obtained from the closest drinking water well. Megan Roberts
7/11/2019 Workplan Requested DEC Project Manager provided work plan revision comments and requested a revised work plan. Megan Roberts
10/11/2019 Site Characterization Workplan Approved Corrective action workplan was approved on this date. This workplan includes a plan to collect soil samples at the source area, the former stockpile location, and the former landspread area to investigate remaining contamination and to sample water from the nearest potable well to assess water quality. Rebekah Reams
9/18/2020 Document, Report, or Work plan Review - other The DEC approved the New Hope Church Phytoremediation/Landfarm Management Plan following comment resolution. This work plan outlines plans to remediate contaminated soil stockpiled at the site through the construction and maintenance of a phytoremediation plot located at the site. Rebekah Reams
3/11/2022 Update or Other Action DEC received the Corrective Action and Release Investigation Report submitted on March 11, 2022. Report is pending review. Rebekah Reams

Contaminant Information

Name Level Description Media Comments

Control Type

Type Details

Requirements

Description Details

There are no documents for this site report.

No associated sites were found.