Action Date |
Action |
Description |
DEC Staff |
6/16/2006 |
Site Characterization Workplan Approved |
Workplan approved this date. |
Anne Marie Palmieri |
6/12/2007 |
Site Added to Database |
Site added to the database. |
Mitzi Read |
7/17/2007 |
Site Characterization Workplan Approved |
Site characterization at this location will be conducted in August 2007. Workplan covering 40 sites along the pipeline was approved this date. Vault box and vault will be removed along with up to 20cy of c-soil. |
Anne Marie Palmieri |
8/16/2007 |
Site Characterization Report Approved |
Site Investigation approved this date. DEC comments on the draft were not addressed, however DEC requested that the COE provide its comments to current and future contractors along with the report. Presence of contamination was confirmed at this site; additional characterization will be conducted in 2007. 4 samples were collected below the valve in the vault and DRO was found exceeding cleanup levels. |
Anne Marie Palmieri |
9/4/2008 |
Site Characterization Report Approved |
Letter sent to the USACE approving the 2007 Site Investigation Report, CH2M Hill, July 2008. 12 passive soil gas probes were installed and no contamination detected. Contamination is likely localized below the vault. The valve and vault could not be pulled during the 2007 investigation as it is too close to the roadbed for the Haines Highway. ADOT&PF plans to realign this section of highway in the next few years and the USACE will address the contamination at that time. |
Anne Marie Palmieri |
10/15/2008 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 75414 name: Haines-Fairbanks Pipeline MP 25.5 |
Anne Marie Palmieri |
6/16/2010 |
Site Visit |
Site visit with Mary Jemin and Will Mangano from USACE. |
Anne Marie Palmieri |
10/9/2012 |
Meeting or Teleconference Held |
Comment resolution meeting was held to discuss DEC's comments on the RI work plan |
Anne Marie Palmieri |
10/11/2012 |
Site Characterization Workplan Approved |
Remedial Investigation work plan approved. |
Anne Marie Palmieri |
10/31/2012 |
Site Visit |
site visit during field work |
Anne Marie Palmieri |
1/18/2013 |
Site Characterization Workplan Approved |
work plan approved for well sampling |
Anne Marie Palmieri |
4/12/2013 |
Meeting or Teleconference Held |
Comment resolution meeting held to discuss DEC's comments on the RI work plan. |
Anne Marie Palmieri |
4/12/2013 |
Meeting or Teleconference Held |
Comment resolution meeting held to discuss DEC's comments on the RI work plan. |
Anne Marie Palmieri |
6/14/2013 |
Site Characterization Report Approved |
Remedial Investigation report approved this date. |
Anne Marie Palmieri |
3/14/2014 |
Document, Report, or Work plan Review - other |
Draft sampling report from groundwater sampling event reviewed this date. No contamination was found in the private wells that were sampled. |
Anne Marie Palmieri |
4/14/2014 |
Meeting or Teleconference Held |
A Comment resolution meeting was held this date with the USACE and their contractor, FES. Sample locations for the upcoming fieldwork in July were discussed. |
Anne Marie Palmieri |
5/15/2014 |
Update or Other Action |
Staff attended the Chilkat Bald Eagle Preserve Advisory Council meeting and provided information on the 3 sites along the Haines Highway. |
Anne Marie Palmieri |
6/19/2014 |
Site Characterization Workplan Approved |
Staff approved a site characterization work plan this date. Field work should occur in July 2014. |
Anne Marie Palmieri |
7/15/2014 |
Site Visit |
Staff met with the USACE's consultant at the start of the characterization activities. |
Anne Marie Palmieri |
2/6/2015 |
CERCLA RI Report Approved |
The Additional Environmental Investigation Report was approved this date. Soil and groundwater samples further defined the extent of the contamination. Samples collected towards the Chilkat River demonstrated that the contamination has not migrated to the river. |
Anne Marie Palmieri |
4/14/2016 |
Document, Report, or Work plan Review - other |
DEC approved the supplemental groundwater monitoring work plan on this date. |
Anne Marie Palmieri |
5/5/2016 |
Public Notice |
USACE gave an update about this site at the Army Restoration Advisory Board meeting on this date. |
Anne Marie Palmieri |
5/17/2016 |
Document, Report, or Work plan Review - other |
DEC reviewed the draft 2015 groundwater sampling report on this date and had no comments. |
Anne Marie Palmieri |
2/3/2017 |
Document, Report, or Work plan Review - other |
Sampling and Analysis Plan for groundwater sampling approved this date. |
Anne Marie Palmieri |
2/9/2017 |
Site Characterization Report Approved |
2016 Groundwater monitoring report approved. |
Anne Marie Palmieri |
2/28/2018 |
Site Characterization Workplan Approved |
2018 groundwater work plan approved this date. The only well that will be sampled will be MW-2 located at the gate valve. Field work is scheduled to be started on March 7, 2018. |
Anne Marie Palmieri |
12/10/2018 |
Site Characterization Report Approved |
The groundwater monitoring report was approved on this date. DEC requested that future discussions about cleanup occur in the near term. |
Anne Marie Palmieri |
2/22/2019 |
Document, Report, or Work plan Review - other |
Staff reviewed the draft groundwater monitoring work plan and had no comments on it. The USACE plans to collect samples in April. |
Anne Marie Palmieri |
2/27/2019 |
Meeting or Teleconference Held |
Staff met with the USACE on 2/26 and 2/27 to discuss possible cleanup actions at the site. The USACE plans to conduct an EA in 2019-early 2020 and hopefully conduct a cleanup along a similar timeline as the DOT&PF road realignment project. The EA will include a public comment period that is likely to occur in early 2020. |
Anne Marie Palmieri |
6/21/2019 |
Meeting or Teleconference Held |
Staff discussed potential future actions at the site with the USACE. |
Anne Marie Palmieri |
6/28/2019 |
Update or Other Action |
Staff sent a letter to the USACE regarding the site on this date. |
Anne Marie Palmieri |
7/17/2019 |
Site Visit |
CS and USACE staff conducted a site visit on this date. |
Anne Marie Palmieri |
6/24/2020 |
Document, Report, or Work plan Review - other |
CS staff reviewed the Draft 2018 Groundwater Sampling Report and provided comments to the USACE. |
Anne Marie Palmieri |
7/26/2020 |
Meeting or Teleconference Held |
CS Staff met with the USACE to discuss future actions at the site. |
Anne Marie Palmieri |
8/18/2020 |
Update or Other Action |
The 2019 Groundwater Sampling Report was approved this date. |
Anne Marie Palmieri |
7/22/2022 |
Document, Report, or Work plan Review - other |
Staff reviewed the draft Gate Valve and Soil Removal Work Plan and provided comments to the USACE. |
Anne Marie Palmieri |
8/5/2022 |
Document, Report, or Work plan Review - other |
Staff reviewed USACE responses to DEC comments on the draft Gate Valve and Soil Removal Work Plan. |
Anne Marie Palmieri |
9/14/2022 |
Document, Report, or Work plan Review - other |
Staff reviewed a redline of the 2022 Gate Valve and Soil Removal Work Plan and had no comments on the document. |
Anne Marie Palmieri |
9/27/2022 |
Cleanup Plan Approved |
Staff approved the Gate Valve and Contaminated Soil Removal Work Plan on this date. The gate valve and up to 20 cubic yards of contaminated soil will be removed in early October. |
Anne Marie Palmieri |
5/12/2023 |
Document, Report, or Work plan Review - other |
Staff reviewed the draft removal action report on this date. The USACE used project action levels for this removal that were higher than the approved cleanup levels. |
Anne Marie Palmieri |
7/11/2023 |
Final Cleanup Report Reviewed |
DEC approved the final cleanup report on this date. A copy of the letter is located under Documents. |
Anne Marie Palmieri |
1/7/2024 |
Interim Removal Action Approved |
On this date, staff reviewed and approved the removal action report which documented the October 2022 field activities. |
Anne Marie Palmieri |