Site Report: Haines-Fairbanks Pipeline MP 347 - GV45
Site Name: | Haines-Fairbanks Pipeline MP 347 - GV45 |
---|---|
Address: | Alaska Highway Mile 1242.5, Haines-Fairbanks Pipeline MP 347, Northway, AK 99764 |
File Number: | 900.38.001 |
Hazard ID: | 4468 |
Status: | Cleanup Complete |
Staff: | No Longer Assigned, 9074655229 dec.icunit@alaska.gov |
Latitude: | 62.699278 |
Longitude: | -141.140361 |
Horizontal Datum: | NAD83 |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
Location of Gate Valve #45. The Corps of Engineers has identified the most likely locations where petroleum contamination might be present, including: 1) valves, 2) locations of documented spills, 3) locations where contamination has been noted by local residents or other persons, and 4) scraper traps and pump stations. These locations were the basis for the Site Investigations that were conducted in order to determine if petroleum contamination is present along the pipeline.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
7/17/2007 | Site Characterization Workplan Approved | Workplan approved this date. | Anne Marie Palmieri |
10/22/2007 | Site Added to Database | Site added to the database. | Mitzi Read |
4/29/2008 | Site Characterization Workplan Approved | Workplan approved for USACE ROST activities in May 2008. | Anne Marie Palmieri |
9/4/2008 | Site Characterization Report Approved | Report approved covering 2007 activities. Additional investigation needed. Vault was filled with water. A sample of the water exceeded TAH and TaqH. | Anne Marie Palmieri |
9/29/2010 | CERCLA SI | 2008 ROST SI report approved this date. 8 probes installed and no petroleum contaminated soil found. More investigation planned for 2011. | Anne Marie Palmieri |
12/20/2012 | CERCLA RI Report Approved | RI approved this date. Report covers GVs 45, 49, 52, and 59. Field work was conducted in 2010-2011. | Anne Marie Palmieri |
2/4/2013 | Update or Other Action | project manager has been changed from Palmieri to Morris. | Anne Marie Palmieri |
6/23/2014 | Cleanup Plan Approved | The ADEC Contaminated Sites Program approved the 2014 Work Plan for Contaminated Soil Removal, Pipeline Milepost 347(Gate Valve #45), 383(Gate Valve #48), and 399.5(Gave Valve #49), Formerly Used Defense Sites, Vicinity of Northway, Alaska. | Jessica Morris |
12/29/2014 | Update or Other Action | The ADEC Contaminated Site Program submitted comments on the Draft 2014 Contaminated Soil Removal Report, Pipeline Milepost 347(Gate Valve #45), 383(Gate Valve #48), and 399.5(Gave Valve #49), Formerly Used Defense Sites, Vicinity of Northway, Alaska. | Jessica Morris |
5/1/2015 | Exposure Tracking Model Ranking | Initial ranking with ETM completed for source area id: 75455 name: auto-generated pm edit Haines-Fairbanks Pipeline MP 347 | Jessica Morris |
5/4/2015 | Final Cleanup Report Reviewed | The ADEC Contaminated Site Program approved the Removal Action Report for Contaminated Soil Removal, Pipeline Milepost 347(Gate Valve #45), 383(Gate Valve #48), and 399.5(Gave Valve #49), Formerly Used Defense Sites, Vicinity of Northway, Alaska. 668 cubic yards of contaminated soil as removed from the Gate Valve #45 site, and confirmation sample results were below applicable ADEC cleanup levels. Site closure is recommended. | Jessica Morris |
5/29/2015 | Cleanup Complete Determination Issued | The ADEC Contaminated Site Program approved the No Department of Defense Action Indicated Report for Haines-Fairbanks Pipeline Milepost 347, Gate Vavle #45, Near Northway, Alaska. | Jessica Morris |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
DRO | Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation | Soil |
Control Type
Type | Details |
---|---|
No ICs Required |
Requirements
Description | Details |
---|---|
Advance approval required to transport soil or groundwater off-site. | |
Movement or use of contaminated material (including on site) in a manner that results in a violation of the water quality standards is prohibited (18 AAC 70) |
No associated sites were found.