Action Date |
Action |
Description |
DEC Staff |
1/1/1964 |
Update or Other Action |
Alaskan Air Command Master Plan base map with update notes of January 1, 1966 and January 1, 1970, and hand-drawn edits reportedly from 1971. |
Former Staff |
1/1/1969 |
Update or Other Action |
Corps of Engineers Boring Logs, Shemya AFB, Alaska, AP 526 - AP884, January 1969 - December 82. |
Former Staff |
1/1/1976 |
Update or Other Action |
Corps of Engineers Boring Logs, Shemya AFB, Alaska, DH 885 - DH 1105, January 1976 - May 85. |
Former Staff |
11/1/1982 |
Update or Other Action |
Recoverable, Reclaimable and Waste Petroleum Product Management Plan 19-14. |
Former Staff |
6/15/1984 |
Update or Other Action |
(Undated) Shemya ACE Projects, 1984 to date. Internal Report. Prepared by 5099th CEOS. |
Former Staff |
9/1/1984 |
Preliminary Assessment Approved |
Installation Restoration Program, Phase I Records Search, 5073rd Air Base Group, Shemya Air Force Base, Alaska (dated September 1984) prepared by JRB Associates |
Former Staff |
2/15/1985 |
Update or Other Action |
Management Action Plan, Eareckson Air Station, Alaska (formerly Shemya AFB, Alaska). Prepared by Jacobs Engineering Group. |
Former Staff |
5/1/1985 |
Update or Other Action |
Corps of Engineers Boring Logs, Shemya AFB, Alaska, AP 1105 - AP 1463, May 1985 - November 1987. |
Former Staff |
11/22/1985 |
Update or Other Action |
CH2M Hill trip report dated 1985. |
Former Staff |
12/30/1985 |
Interim Removal Action Approved |
(Undated) Alaska Cleanup Effort, Shemya History 1975 - 1985. Internal Report. Prepared by 5099th CEOS. |
Former Staff |
6/1/1986 |
Update or Other Action |
Phase II - Task I Presurvey Report, Shemya Air Force Base and King Salmon Air Force Station. |
Former Staff |
12/2/1986 |
Notice of Violation |
Notice of Violation letter submitted to Air Force by EPA (Charles Findley, Director of Hazardous Waste Division). A shipment of "salvage materials" violated hazardous waste laws and regulations promulgated under RCRA. |
Former Staff |
9/25/1987 |
Update or Other Action |
Shemya Field Trip Notes, September 15-19, 1987. Prepared by CH2M Hill. |
Former Staff |
7/29/1988 |
Update or Other Action |
Installation Restoration Program, Stage I Workplan, Shemya Air Force Base, Alaska. Prepared by CH2M Hill. |
Former Staff |
8/15/1988 |
Update or Other Action |
Environmental Sampling Data Sheet. |
Former Staff |
8/29/1988 |
Update or Other Action |
Comprehensive Plan, Shemya Air Force Base. Prepared by TRA/FARR and Dowl Engineers. |
Former Staff |
9/2/1988 |
Update or Other Action |
Pollution Incident Report. |
Former Staff |
9/9/1988 |
Update or Other Action |
Installation Restoration Program, Stage I Quality Assurance Project Plan, Shemya Air Force Base, Alaska. |
Former Staff |
9/19/1988 |
Update or Other Action |
(Old R:Base Action Code = SI - Site Investigation). CH2M Hill submits the Final Draft Technical report dated 2/28/90 for the Stage I IRP. The report presents the findings of CH2M Hill's site visit and sampling efforts during September and October 1988. 22 individual sites were investigated. Some of the findings include TPH up to 200,000 ppm in soil and 110 ppm in groundwater, PCBs detected in many soil samples and chlorinated compounds detected at several locations. |
Former Staff |
10/1/1988 |
Update or Other Action |
Evaluation of Lake at Shemya Air Force Base, Alaska. Technical memorandum prepared by Robert Binovi summarizing an evaluation of water samples collected from lakes at Shemya Island. |
Former Staff |
10/1/1988 |
Update or Other Action |
Corps of Engineers Boring Logs, Shemya Air Force Base, Alaska, AP1464 - AP1765, October 1988 - April 1991. |
Former Staff |
10/5/1988 |
Update or Other Action |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). CH2M Hill submits final work plans, QA plans and health and safety plans for Stage I IRP |
Former Staff |
10/17/1988 |
Update or Other Action |
Trip Report, Shemya Air Force Base, Alaska. Memorandum by Clare Jaeger (COE) summarizing the contamination discovered during soil and water sampling on October 6, 1988. |
Former Staff |
2/8/1989 |
Update or Other Action |
Water System, Phase 1B, Surface Water Quality of Several Lakes, Shemya AFB, Alaska Technical memorandum prepared by Thomas Delwyn summarizing a surface water quality investigation conducted at Shemya in October 1988. |
Former Staff |
2/13/1989 |
Update or Other Action |
Cold Storage Facility, POL Contamination Investigation, Shemya Air Force Base, Alaska. Memorandum by Thomas Delwyn (COE) summarizing an investigation conducted at three locations near the power plant for proposed Cold Storage Facility. |
Former Staff |
3/30/1989 |
Update or Other Action |
Water System Upgrade, Phase II (Power Plant, DOD Anders, Hangar 4), POL Contamination Investigation, Shemya AFB, Alaska. Memorandum by Thomas Delwyn (COE) summarizing a May 1989 investigation conducted at three alternative locations for proposed Cold Storage Facility. |
Former Staff |
6/15/1989 |
Update or Other Action |
PCB Investigation of Building 3055. Document 7, AF 5099th, 1989. Files (notes, forms, sketches) obtained from 611th CES/CEOR, as part of Alaska Clean-up Effort in late 1980s. |
Former Staff |
6/15/1989 |
Update or Other Action |
1988 U.S. Army COE discovery of additional POL Contamination. |
Former Staff |
7/6/1989 |
Update or Other Action |
POL Contamination Investigations at Shemya Air Force Base, Alaska. Memorandum by Thomas Delwyn (COE) summarizing an April 1989 investigation of POL contamination relating to design and construction of several projects. |
Former Staff |
7/6/1989 |
Update or Other Action |
POL Contamination Investigations at Shemya Air Force Base, Alaska, 25 April through 3 June 1989. Memorandum by Thomas Delwyn (COE). |
Former Staff |
7/20/1989 |
Update or Other Action |
ADAL Aircraft Equipment Shop, POL Contamination Investigations at Shemya AFB, AK. |
Former Staff |
8/28/1989 |
Update or Other Action |
Communication Facility, POL Contamination Investigations at Shemya Air Force Base, Alaska. Memorandum by Thomas Delwyn (COE) summarizing an investigation conducted in May 1989 to obtain data on the extent of POL contamination at the site of the new communication facility and to obtain design information for Worker Safety and Dewatering during construction. |
Former Staff |
9/15/1989 |
Update or Other Action |
Preliminary Assessment / Site Investigation report completed. |
Former Staff |
10/5/1989 |
Update or Other Action |
Notice of Noncompliance letter to Air Force Shemya Contractors by EPA (Gil Haselberger, Chief of Toxic Substances Section) regarding a June 1989 inspection and violations with TSCA. |
Former Staff |
11/1/1989 |
Update or Other Action |
Cold Storage Facility, POL Contamination Investigations at Shemya Air Force Base, Alaska. Memorandum by Thomas Delwyn (COE) summarizing an April 1989 investigation of POL contamination relating to design and construction of several projects. |
Former Staff |
11/1/1989 |
Update or Other Action |
Cold Storage Facility, POL Contamination Investigations at Shemya Air Force Base, Alaska. Memorandum by Thomas Delwyn (COE) summarizing an April 1989 investigation of POL contamination relating to design and construction of several projects. |
Former Staff |
2/28/1990 |
Update or Other Action |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). CH2M Hill Submits draft work plans dated 2/28/90 for IRP Stage 2. Stage 2 is intended to be a more concentrated sampling episode based on the results of the Stage I Technical Report. |
Former Staff |
6/12/1990 |
Update or Other Action |
Federal Facility Compliance Agreement between the Air Force (signed by Charles Crabb, Jr., 5073d ABG/CC) and EPA (signed by Charles Findley, Director of Hazardous Waste Division) on March 15, 1991 regarding noncompliance with RCRA. RCRA Docket Number 1090-04-02-3008. |
Former Staff |
6/13/1990 |
Update or Other Action |
Notice of Noncompliance letter to 5073 ABG/CC Air Force by EPA (Charles Findley, Director of Hazardous Waste Division) regarding RCRA violations; RCRA Docket Number 1090-04-02-3008. The attachment included a Federal Facilities Compliance Agreement with a Notice of Noncompliance, a Compliance Schedule, and a Notice of Necessity for Conference. The Air Force response letter (signed by Colonel Charles Crabb, Jr., Commander) is dated April 1991, and includes attachments. |
Former Staff |
8/10/1990 |
Update or Other Action |
Installation Restoration Program, Stage I Final Technical Report for Shemya Air Force Base, prepared by CH2M Hill |
Former Staff |
9/14/1990 |
Update or Other Action |
Installation Restoration Program, Stage 2 Final Workplan, Shemya Air Force Base. Prepared by CH2M Hill. |
Former Staff |
10/26/1990 |
Update or Other Action |
Memorandum from Environmental Contaminants Coordinator, USFSW, to Supervisor, Fisheries Management Services regarding fish from Shemya Lakes. |
Former Staff |
11/1/1990 |
Update or Other Action |
Volume III, Concept Approved Draft of the Coastal Management Plan. |
Former Staff |
1/22/1991 |
Update or Other Action |
Results of Hazardous Toxic Waste Study, Cold Storage, Shemya Air Force Base, Alaska. Memorandum by Thomas Delwyn (COE) summarizing the results of hazardous toxic waste investigations conducted at three alternative locations for proposed Cold Storage Facility. |
Dan Hartung |
6/1/1991 |
Update or Other Action |
PCB Core Sample Plan, Building 3055, Shemya. |
Dan Hartung |
6/25/1991 |
Update or Other Action |
Site Summaries for Shemya Air Force Base, Alaska Installation Restoration Program. |
Dan Hartung |
7/26/1991 |
Update or Other Action |
Notice of Violation / Request for Corrective Action letter to 5099th CEOS Air Force (Captain Kenneth Brown, Chief of Environmental Contract and Planning Section) from ADEC (Ron Klein, Manager of Regional Contaminated Sites) regarding numerous sites and the status of site assessments and remedial actions. The Air Force response letter is dated August 29, 1991. ADEC letter dated September 23, 1991 serves as a formal notification that the terms of the NOV were satisfied. |
Dan Hartung |
8/27/1991 |
Update or Other Action |
Shemya Soils and Groundwater Database. |
Dan Hartung |
10/4/1991 |
Update or Other Action |
Installation Restoration Program (IRP) Field Investigation Plan, Shemya Air Force Base, Alaska (2 volumes). |
Dan Hartung |
6/23/1992 |
Site Characterization Workplan Approved |
(Old R:Base Action Code = SI - Site Investigation). EPA has reviewed the Field Investigation Plan submitted for Shemya Air Force Base. |
Ray Burger |
6/23/1992 |
Update or Other Action |
EPA has reviewed a preliminary assessment submitted for Shemya Air Force Base. |
Ray Burger |
7/31/1992 |
Notice of Violation |
Compliance Advisory letter to Alaska District Army (Colonel John Pierce) by ADEC (Ronald Klein, Contaminated Sites Program Supervisor) regarding Application of Underground Storage Tanks (UST) regulations to removal and installation of USTs at Shemya AFB. The Air Force response letter is dated September 18, 1992. |
Ray Burger |
1/1/1993 |
Update or Other Action |
Trip Report: Winter Wildlife and Oil Contamination Surveys, Shemya I., Alaska, 4-8 January 1993. |
Ray Burger |
1/13/1993 |
Update or Other Action |
Chemical Data Report, Shemya Seawall/Erosion Protection, Shemya Air Force Base, Alaska. Memorandum prepared by Thomas Delwyn documenting a sampling effort to investigate potential soil contamination in areas to be excavated at Eareckson AS. |
Ray Burger |
2/1/1993 |
Update or Other Action |
(Old R:Base Action Code = FI - Field Inspection (General)). |
Former Staff |
2/1/1993 |
Update or Other Action |
Shemya Air Force Base, Alaska 1992 Installation Restoration Program Field Investigation Report, prepared by CH2M Hill; report finalized in February 1993 |
Ray Burger |
3/1/1993 |
Update or Other Action |
Field Survey Report and Computer Database for Underground Storage Tanks at Shemya Air Force Base, Shemya Island, Alaska. Prepared by 11th CES. |
Ray Burger |
3/29/1993 |
Update or Other Action |
Chemical Data Report, Hazardous Waste Management Facility and Hazardous Material Storage Facility, Shemya AFB, AK. |
Ray Burger |
5/20/1993 |
Update or Other Action |
Status of Shemya Air Force Base in Relation to Proposal for the National Priorities List. |
Ray Burger |
6/1/1993 |
Update or Other Action |
Shemya Air Force Base, Alaska General Stockpiling Plan for Contaminated Soil. |
Ray Burger |
6/15/1993 |
Update or Other Action |
Field Survey Report and Computer Database for Underground Storage Tanks at Shemya Air Force Base, Shemya Island, Alaska. Prepared by Ecology and Environment. |
Ray Burger |
12/1/1993 |
Update or Other Action |
Eareckson Air Force Station (formerly Shemya AFB, Alaska) 1993 Installation Restoration Program Basewide and Limited Source Investigation Workplan. Prepared by Jacobs Engineering Group. |
Ray Burger |
12/15/1993 |
Update or Other Action |
Letter to ADEC from Major Herr (11th Civil Engineering Operations Squadron) regarding Underground Storage Tank Site List and transfer of sites. |
Ray Burger |
1/9/1994 |
Update or Other Action |
Final Stockpile Soil Cells Evaluation of Alternatives Technical Memorandum final dated September 1995, received January 1996). |
Ray Burger |
2/1/1994 |
Update or Other Action |
Shemya Air Force Base, Alaska 1992 Installation Restoration Program Field Investigation Report, prepared by CH2M Hill; report finalized in February 1993 |
Ray Burger |
4/15/1994 |
Site Ranked Using the AHRM |
Initial ranking. |
Ray Burger |
5/2/1994 |
Site Added to Database |
TPH in soil and groundwater. |
Ray Burger |
5/17/1994 |
Update or Other Action |
Release Investigation for Buildings 588, 614, 625 and 1001. Prepared by 11th CEOS. |
Ray Burger |
7/25/1994 |
Update or Other Action |
ADEC letter from Kent Patrick-Riley (UST Program) to Michael Stanka (611 Air Force) regarding Closure of Cobra Dane Askarel Tank Pit and Piping Trench UST Site Assessment (dated March 1994) |
Kent Patrick-Riley |
8/30/1994 |
Update or Other Action |
Shemya AS Long Term Soil Containment Cells Soil Sampling, June 1994. |
Ray Burger |
9/30/1994 |
Notice of Violation |
Notice of Violation letter to 673rd ABG Air Force (Colonel Johnny Jarnigan, Commanding Officer) from ADEC (Janice Adair, Regional Administrator) regarding the April 1994 RCRA Compliance Evaluation Inspection. |
Ray Burger |
12/15/1994 |
Update or Other Action |
Final Remedial Investigation, Workplan and Sampling and Analysis Addendum, 1994 Field Season, Eareckson Air Station, Alaska (formerly Shemya AFB, Alaska). Prepared by Jacobs Engineering Group. |
Ray Burger |
1/1/1995 |
Update or Other Action |
Natural Resource Plan, Eareckson AS, Shemya Island, Alaska, draft. |
Ray Burger |
1/31/1995 |
Update or Other Action |
Memorandum from 611 CES/CEOR to 611 CES/CEVR regarding Asphaltic Tar Soil Samples, Eareckson AS, Alaska. |
Ray Burger |
2/1/1995 |
Update or Other Action |
Community Relations Photo Notebook; Remedial Investigations, Feasibility Studies and Remedial Actions. |
Ray Burger |
3/3/1995 |
Update or Other Action |
Underground Storage Tank (UST) Removals and Site Assessments 1994, Eareckson AS, Alaska. (final dated February 1995, received March 1995) Prepared by 611 CES. |
Ray Burger |
3/15/1995 |
Update or Other Action |
Construction Rigging, Inc. Field Report, Oil/Water Separators, Eareckson Air Station, Alaska. Final report. Prepared by Environmental Management Corporation. |
Ray Burger |
4/1/1995 |
Update or Other Action |
Eareckson AS Thermal Unit Spill Area Cleanup, final/draft. |
Ray Burger |
4/15/1995 |
Update or Other Action |
Revised 1994 Well Abandonment Summary Report. Prepared by Jacobs Engineering Group. |
Ray Burger |
8/1/1995 |
Update or Other Action |
Eareckson AS, Shemya Island, Alaska Fact Sheet Numbe 2 "Public Involvement in the Decision Making Process". |
Ray Burger |
9/16/1995 |
Update or Other Action |
(Old R:Base Action Code = RI - Remedial Investigation). RI action added by Shannon and Wilson on 3/14/97, based on Relative Risk Evaluation Worksheet dated 9/16/95. RI is current phase on worksheet. Site description: Power plant area, numerous fuel spills and waste oil storage. Pathway: groundwater at 100', surface water drainages through middle. Receptors: Site is upgradient of base drinking water wells. |
S&W-Miner |
10/23/1995 |
Update or Other Action |
Notice of Violation letter to USAF (Colonel Samuel Johnson III) from ADEC (Michael Conway, Industrial Operations Section Chief) regarding the June 1995 hazardous waste inspection. |
Ray Burger |
12/1/1995 |
Update or Other Action |
Management Action Plan, Eareckson Air Station, Alaska (formerly Shemya AFB, Alaska). |
Ray Burger |
1/15/1996 |
Update or Other Action |
Final Remedial Investigation / Feasibility Study Report, Volume III, Eareckson Air Station, Alaska (Formerly Shemya Air Force Base Alaska). |
Ray Burger |
2/20/1996 |
Update or Other Action |
Memorandum for the record: Possible Mercury Site at Eareckson AS. |
Ray Burger |
3/15/1996 |
Site Characterization Report Approved |
Final Remedial Investigation / Feasibility Study Report, Volume IV, Eareckson Air Station, Alaska (Formerly Shemya Air Force Base Alaska). |
Ray Burger |
7/1/1997 |
Update or Other Action |
Environmental Compliance Transition Plan (draft dated June 1997, received on July 1, 1994, no final prepared). |
Gretchen Pikul |
8/10/1998 |
Update or Other Action |
Final Post Construction Report for Contaminated Soil Stockpiles Remedial Action (dated August 1998), and Technical Memorandum Contaminated Soil Stockpiles Sampling Results (dated July 1997). |
Gretchen Pikul |
10/20/1998 |
Update or Other Action |
Compliance Site Investigations Building 3055, Hangar 2 Area, Source Area SS23 (draft dated March 1996, received on October 20, 1998, no final received). |
Gretchen Pikul |
10/30/1998 |
Meeting or Teleconference Held |
Meeting with Air Force on response to comments for Decision Documents Volumes 3 and 4. Two main issues - (1) documents lacking detail necessary to describe remedial investigation, risk assessment, remedial, and no-further-action decisions, and (2) Air Force determination that no analyses will be performed for DRO, GRO and RRO based on a 1994 Department approval of specific petroleum constituents for risk assessment studies. No resolution reached on these 2 main issues - outcome resulted in potential for dispute resolution process. |
Gretchen Pikul |
11/23/1998 |
Meeting or Teleconference Held |
Meetings with Air Force on Decision Documents Volumes 3 and 4. Two main issues - (1) level of detail needed in documents, and (2) no DRO, GRO and RRO analyses in long-term monitoring. No resolution reached on these 2 main issues - outcome resulted in potential for dispute resolution process. |
Gretchen Pikul |
12/10/1998 |
Notice of Violation |
Compliance Advisory letter to 611 CES/CEVR Air Force (Scott Hansen, Chief of Environmental Restoration) from ADEC (John Halverson, project manager) for the sampling and disposal of contaminated stockpiled soil without ADEC involvement or concurrence. The Air Force response letter is dated January 6, 1999. |
Gretchen Pikul |
12/11/1998 |
Update or Other Action |
ADEC sent out letter outlining the remaining unresolved issues from the 3 Decision Document comment resolution meetings. |
Gretchen Pikul |
12/17/1998 |
Update or Other Action |
Final Management Action Plan (updated December 1998). |
Gretchen Pikul |
12/30/1998 |
Meeting or Teleconference Held |
Meeting with Air Force on Decision Documents Volumes 3 and 4. Two main issues - (1) level of detail needed in documents, and (2) no DRO, GRO and RRO analyses in long-term monitoring. Avoided formal dispute resolution process - began working on document detail needed and necessary analyses for long-term monitoring. |
Gretchen Pikul |
1/20/1999 |
Meeting or Teleconference Held |
Meeting with Air Force to discuss appropriate sites to be included within the Decision Documents Volumes 3 and 4 and the appropriate site status (transfer to Compliance, RCRA, Remedial Actions, and No-Further-Remedial-Action-Planned). |
Gretchen Pikul |
1/20/1999 |
Update or Other Action |
Final Basewide Monitoring Program Workplan - note DRO, GRO and RRO were not included as requested by ADEC |
Gretchen Pikul |
2/2/1999 |
Meeting or Teleconference Held |
Meeting with Air Force on 3 potential NFRAP sites (SS05, ST09 and ST44), ADEC prepared briefing papers with questions for Air Force |
Gretchen Pikul |
2/3/1999 |
Update or Other Action |
Technical Memorandum Soil Stockpile Treatment Cell, Round 2 Sample Results, August 1998 (draft dated November 1998, received February 3, 1999). |
Gretchen Pikul |
2/5/1999 |
Update or Other Action |
Remedial Investigation Basewide Groundwater Monitoring Report, August - September 1998, Basewide Monitoring Activities and Findings (dated January 1999) |
Gretchen Pikul |
3/3/1999 |
Update or Other Action |
Soil Stockpile History and Documentation. |
Gretchen Pikul |
5/11/1999 |
Update or Other Action |
Final Building 3055 Site Assessment Findings (dated April 1999). |
Gretchen Pikul |
6/22/1999 |
Meeting or Teleconference Held |
ADEC participated in a facility-wide site visit from June 22 - 25. The 24 site inspections and discussions were designed to aid in the development and review of upcoming Decision Documents. |
Gretchen Pikul |
6/25/1999 |
Update or Other Action |
Project Report - Underground Storage Tank Site Assessment Reports, Aboveground Storage Tank Removal Reports and Environmental Compliance Activities (dated June 1999). |
Gretchen Pikul |
7/21/1999 |
Meeting or Teleconference Held |
Meeting with Air Force on 4 documents: Closure Sampling Plan, Abandoned Runway B (draft dated March 1999) also discussed in a May 11th meeting; Response to ADEC's December 10, 1998 comments regarding Technical Memorandum Contaminated Soil Stockpiles Sampling Results (dated July 1997) and Final Post Construction Report for Contaminated Soil Stockpiles Remedial Action (dated August 1998); Closure Confirmation Sampling Approach for Landspread Soils (dated April 1999); and Eareckson Air Station Soil Stockpile History and Documentation (dated March 1999).
Received Final Workplan on the Closure Sampling Plan of Soil Treatment Cell, Abandoned Runway B (dated May 1999). |
Gretchen Pikul |
11/30/1999 |
Update or Other Action |
Decision Documents (review draft dated November 1999, received November 30, 1999, meeting on January 4, 2000). |
Gretchen Pikul |
11/30/1999 |
Update or Other Action |
Final Environmental Restoration Workplan, Closure Confirmation Sampling for Landspread Soils (draft dated September 1999, final dated November 22, 1999); previous document titled Closure Confirmation Sampling Approach for Landspread Soils (draft dated April 1999). |
Gretchen Pikul |
1/4/2000 |
Meeting or Teleconference Held |
ADEC participated in a Decision Document meeting with Air Force and USFWS; ADEC reviewed, commented and participated in internal briefing meetings during January and February. |
Gretchen Pikul |
4/5/2000 |
Meeting or Teleconference Held |
ADEC participated in a National Missile Defense System meeting; Eareckson AS is one of the proposed sites. Calls and e-mails regarding workplan and necessary paperwork throughout spring and summer. |
Gretchen Pikul |
11/1/2000 |
Update or Other Action |
Environmental Compliance Program - Site Assessments and Remediation Plan - Calendar Year 1997 UST Removal dated February 2000; ADEC Storage Tank Program comment letter dated June 22, 2000; final workplan retitled Final Corrective Action Plan and Corrective Action Plan Addendum (dated August 2000). |
Gretchen Pikul |
1/16/2001 |
Meeting or Teleconference Held |
Decision Document and general status meeting with new Air Force project manager, Larry Opperman and staff. |
Gretchen Pikul |
3/22/2001 |
Meeting or Teleconference Held |
Meeting with 611th Compliance, 611th Restoration and their consultant regarding contamination encountered at Power Plant during a floor drain wastewater collection sump removal project - potential to include this area into IRP sites ST09 and ST44. |
Gretchen Pikul |
4/4/2001 |
Update or Other Action |
Environmental Site / Project Summary Floor Drain Wastewater Collection Sump Removal at Building 3051 (Power Plant area) (draft dated March 15, 2001, ADEC comment letter dated April 4, 2001, final not submitted yet) |
Gretchen Pikul |
4/6/2001 |
Update or Other Action |
Environmental Site / Project Summary for Site SS-023 (draft dated March 7, 2001, ADEC comment letter dated May 8, 2001) |
Gretchen Pikul |
4/6/2001 |
Update or Other Action |
Workplan and Sampling and Analysis Plan - for Floor Drain Wastewater Collection Sump Removal, Tank Tightness and Contaminated Soils Remediation (Power Plant area) (draft dated September 25, 2000, final dated October 16, 2000, no draft was submitted for ADEC review and comment) |
Gretchen Pikul |
4/6/2001 |
Update or Other Action |
Landspread Closure Confirmation Sampling Report - no IRP site designation, contaminated soil stockpiled on Abandoned Runway B from IRP and UST/AST sources all over the island (draft dated November 28, 2000, meeting on December 27, 2000 to discuss exceedences, ADEC comment letter dated January 8, 2001, final dated March 15, 2001, received on April 6, 2001) - contaminated soil in stockpiles from ST09 and ST44 (3,500 gallon diesel UST 132 removal and soil cleanup) |
Gretchen Pikul |
7/3/2001 |
Update or Other Action |
Technical Memorandum - Risk Assessment Assumptions for Decision Documents (draft final dated January 8, 2001, ADEC comment letter dated March 19, 2001, comment resolution meeting on May 18, 2001, final received June 11, 2001, ADEC e-mail comments after reviewing final document dated July 3, 2001). |
Gretchen Pikul |
8/1/2001 |
Update or Other Action |
Proposal to Sample Contaminated Soil Treatment Cell and Biovent Test Cell, Abandoned Runway B (ADEC comment letter dated June 28, 2001, and also sent a waiver approval letter for impartial third party sampling requirement; final proposal received August 1 with ADEC comments incorporated, along with the COE report on the ex-situ pilot study). |
Gretchen Pikul |
10/11/2001 |
Update or Other Action |
Soil Stockpile / Treatment Cell Sampling report (dated August 2001) acrobat reader pdf format – report neither states ‘draft’ or ‘final’ – no hardcopy received. |
Gretchen Pikul |
12/10/2001 |
Update or Other Action |
Decision Document Report Volumes III and IV (draft dated March 1996; draft final dated April 1997 and received May 1997; ADEC comment letter dated October 1, 1997 with extensive comments; related meetings in 1998 on October 30, November 23, November 24 and December 30; related meetings in 1999 on January 20 and 26, February 2 and 25, June 22-25 during site visit, August 24 during FY00 project scoping meeting, and October 1; received Review Draft Decision Documents on November 30, 1999 ADEC comment letters in February 2000; related meetings in 2000 on January 4; related meetings in 2001 on January 4 and 16; ADEC comment letter on Draft Final Technical Memorandum - Risk Assessment Assumptions for Decision Documents (dated March 19) with comment resolution meeting on May 18, final memorandum dated June 2001; draft Proposed Plan for 6 sites received August 24, ADEC comment letter dated September 19, 'response to comments' received December 10, 2001). |
Gretchen Pikul |
12/18/2001 |
Update or Other Action |
National Missile Defense - Ground-based Midcourse Defense Joint Program Office (GMD JPO) Contaminated Media Environmental Work and Quality Plans Part I - III; draft dated July 2001 and received on August 20, 2001; ADEC comment letter dated September 17, 2001; comment resolution teleconference on November 7, 2001, all issues resolved; ADEC approval letter based on incorporation of comments dated November 8, 2001; ADEC concurrence on Air Force letter regarding contaminated soil being placed back in excavations with restrictions dated November 8, 2001; final work plans dated December 2001 and received December 18, 2001. |
Gretchen Pikul |
3/3/2003 |
Meeting or Teleconference Held |
Air Force Memo for Record - Subject: Meeting with ADEC on contamination discovered at the Defense Satellite Communication System (DSCS) construction site at Eareckson AS (draft dated February 27, 2003) see March 3 e-mail. |
Gretchen Pikul |
6/16/2003 |
Update or Other Action |
Excavation and Handling of Contaminated Media at the IDT and DSCS Site - Missile Defense construction activities report (dated March 2003 and Air Force transmittal letter dated June 16, 2003). |
Gretchen Pikul |
8/31/2004 |
Update or Other Action |
Feasibility Study Remedial Treatment Alternatives for Contaminated Soil Stockpiles; draft dated December 2003 and received via e-mail on January 21, 2004; ADEC comment letter dated February 2, 2004; ADEC received draft Air Force Comment Response via e-mail and participated in a call with Missile Defense Program on the Air Force Comment Response for the draft Feasibility Study report on July 8, 2004; ADEC submitted comments on Comment Response on July 23; ADEC participated in a comment resolution meeting (FS is no longer contractor funded and revisions will need to be made in-house)on August 5; ADEC participated in e-mails with MDP on finalizing FS report on August 31. |
Gretchen Pikul |
10/16/2007 |
Meeting or Teleconference Held |
Discuss site at TRIAD Meeting to discuss future actions at the site including review of RI data to evaluate groundwater impacts. Also As-Builts will be reviewed to learn more about the loaction and source of concrete sumps at the site. |
Jonathan Schick |
11/16/2007 |
Site Visit |
ADEC staff travelled to Eareckson Air Station for 4 days to conduct site visits and become familiar with the ecology and topography of the island. Site visits were conducted to all pertinent sites and meetings were held to discuss the plan moving forward for Records of Decision and remedial alternatives. |
Jonathan Schick |
3/6/2008 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed. |
Jonathan Schick |
5/6/2008 |
Update or Other Action |
ADEC staff issued a letter to the USAF regarding the submission of a Remedial Investigation Work Plan that does not address all of the site characterization information required by the state. It is the recommendation of the ADEC that a more comprehensive remedial investigation be conducted to collect a sufficient amount of information to characterize the subsurface contamination at each of the 12 sites in question. |
Jonathan Schick |
7/11/2008 |
Site Characterization Workplan Approved |
ADEC staff approved the Remedial Field Investigation Work Plan for 12 sites including SS009. |
Jonathan Schick |
12/4/2008 |
Update or Other Action |
ADEC recieved a copy of a Work Plan Addendum for 6 sites including SS005, ST009, SS012, SS023, SS025, and ST050. They are scheduled to begin work to further delineate the extent of contamination at these 6 sites on Monday December 8, 2008. |
Jonathan Schick |
12/9/2008 |
Update or Other Action |
ADEC Staff issued a letter to the 611th indicating that the Work plan Addendum for 6 sites at Eareckson AS would not be approved. We are not able to approve this Work plan Addendum at this time because of the one day turnaround time and the lack of information provided to render decisions applicable to this sampling program. Upon reviewing this document several questions arise about the proposed field activities.
Without having an opportunity to review the data collected from the Remedial Field Investigation performed this summer, we cannot determine the appropriateness or comprehensiveness of the proposed sampling strategy. Therefore, by proceeding with this Work plan Addendum without the ADEC’s approval, there is a chance that we will not concur with the conclusions and recommendations derived from this Remedial Field Investigation.
|
Jonathan Schick |
3/26/2009 |
Update or Other Action |
ADEC staff recieved a draft version of the Analytical Data Report for the 12-site Remedial Investigation at Eareckson AS. A Draft Risk ASsessment Work Plan was submitted at the same time for our review. |
Jonathan Schick |
7/29/2009 |
Update or Other Action |
ADEC Staff recieved a draft version of the Remedial Field Investigation at 12 Environmental Restoration Sites Remedial Investigation Report dated July, 2009. THe report details the findings from the Remedial Field Investigation that took place during 2008. The purpose of the RFI was to gather additional information about the 12 subject sites in order to support a Risk Assessment. Additional Site characterization will be necessary at SS12 where the PCB contamination extends beyond the bounds of the 2008 investigation. |
Jonathan Schick |
8/25/2009 |
Update or Other Action |
ADEC staff submitted comments on the Draft Remedial Field Investigation Report for 12 SItes at Eareckson AS. The report detailed the results of the investigation that took place in 2008. THe State's concerns are regarding the incomplete characterization of the PCB contamination at SS12 adn some inconsistencies between the Work Plan and the Field Investiagtion including some subsurface sampling that was excluded from the RFI. |
Jonathan Schick |
6/11/2010 |
CERCLA RI Report Approved |
Contaminated Sites Staff recieved the Final version of the Remedial Investigation Report for the Remedial Field Inestigation at 12 Environmental Restoration Program Sites dated June 2010. |
Jonathan Schick |
7/29/2010 |
Update or Other Action |
ADEC submitted comments on the Draft Remedial Field Investigation at 12 Environmental Restoration Program Sites (Addendum) which included an island wide background metals sampling event. The State;s main concern with the report is the statistical analysis of the background metals as the 95% UCL was used as the background concentration instead of the UPL or UTL. Additionally the report detailed the follow-on remedial investigation of the PCB impacts at SS012. |
Jonathan Schick |
11/3/2010 |
Site Characterization Report Approved |
Contaminated Sites Staff issued a letter to the USAF approving the Final version of the Remedial Field Investigation at 12 Environmental Restoration Program Sites Remedial Investigaion Report Addendum. The report detailed the additional investigation of the extent of PCB impacted soils at SS012 the Old White Alice Site at Eareckson Air Station. Samples were collected around the perimeter of the previous investigations and also down the slope that drops from the site to the north/northwest. Also the addendum detailed the collection and calculation of background metals concentration from across the island at locations not associated with known contaminated sites. |
Jonathan Schick |
6/3/2011 |
CERCLA FS |
Contaminated Sites Staff recieved the Draft Feasibility Study for 12 sites at Eareckson Air Station for our review. The Study details the proposed remedial alternatives that were analyzed for the 12 contaminated sites that are under review. |
Jonathan Schick |
7/15/2011 |
Document, Report, or Work plan Review - other |
Contaminated Sites Staff submitted a letter to the Air Force's Remedial Project Manager with comments on the Draft Feasibility Study Report with the state's concerns about the inadequate characterization of the groundwater at several of the sites within the report. |
Jonathan Schick |
8/17/2011 |
Update or Other Action |
Contaminated Sites Staff recieved responses to our comments on the Draft Feasibility Study Report that were submitted to the Air Force in July 2011. The responses were not in concurrence with our concerns about the inadequate characterization of some of the groundwater at the sites and a comment resolution meeting will be necessary to resolve the outstanding issues. |
Jonathan Schick |
9/6/2011 |
Update or Other Action |
Contaminated Sites Staff submitted a letter to the Air Force regarding their response to our comments on the Feasibility Study Report for the 12 Site Remedial Investigation. ADEC does not feel like the groundwater impacts at some of the sites is adequate or complete and additional monitoring wels may need to be installed to deterine a remedy. |
Jonathan Schick |
9/22/2011 |
Meeting or Teleconference Held |
Contmainted Sites Staff met with the Air Force's Remedial Project Manager to discuss issues remaining on the Draft Feasibility Study for th 12 Site Remedial Field Investigation at Eareckson Air Station. The topics discussed in the meeting were regarding the need to expand the monitoring well network at several of the subject sites so that the extent of contamination could be accurately documented for the Record of Decision for the sites. Additional monitoring well points were agreed to a some of the sites and long term monitoring was agreed to become the preferred alternative at ST009. |
Jonathan Schick |
12/20/2011 |
CERCLA FS |
Contaminted Sites Staff recieved the final version of the Feasibility Study Report for 12 sites at Eareckson Air Station. The comments from the draft were resolved and the changes incorporated into the Final document. |
Jonathan Schick |
6/12/2012 |
CERCLA Proposed Plan |
Contaminated Sites Staff recieved the Draft Proposed Plan for several of the 12 sites that went through the Remedial Investigation together in 2008. The proposed plan incorporates this site with ST044 and the preferred remedial alternative presented in the plan is Monitored Natural Attenuation for the groundwater adn Long Term Management with Institutional Controls for the groundwater, and soils. |
Jonathan Schick |
3/17/2014 |
CERCLA ROD Approved |
The ADEC Contaminated Site Program approved the February 2014 Record of Decision for LF015, SS005, SS012, ST009, and ST044. The selected remedy for ST009/ST044 is long-term management with institutional controls for surface and subsurface soil contamination and monitored natural attentuation with institutional controls for groundwater contamination. |
Jessica Morris |
8/27/2014 |
Long Term Monitoring Established |
The ADEC Contaminated Sites Program approved the Final Work Plan for Environmental Long Term Monitoring and Site Inspections ((FT001, FT002, FT003, OT048, SS007, LF015, LF018, LF024, LF026, SS010, SS023, ST035, SS025, ST009, ST044, ST046, ST050, ST051) and Limited Site Characterization (Building 3055 Area) at Eareckson Air Station, Alaska. This scope of work is not sufficient to meet the long term monitoring objectives outlined in the most recently established RODs. The USAF will hold a scoping meeting with ADEC to plan additional well installation to meet these long term monitoring requirements. |
Jessica Morris |
5/20/2015 |
Institutional Control Compliance Review |
The ADEC Contaminated Sites Program approved the Final Report for Environmental Long Term Monitoring and Site Inspections ((FT001, FT002, FT003, OT048, SS007, LF015, LF018, LF024, LF026, SS010, SS023, ST035, SS025, ST009, ST044, ST046, ST050, ST051) at Eareckson Air Station, Alaska. |
Jessica Morris |
10/22/2015 |
Update or Other Action |
The ADEC Contaminated Sites Program reviewed and commented on a draft scope of work for investigation, remedial process optimization, and long term management studies at several sites for Eareckson Air Station. |
Jessica Morris |
8/31/2016 |
Site Characterization Workplan Approved |
The ADEC Contaminated Sites Program conditionally approved the 2016 Uniform Federal Policy - Quality Assurance Project Plan (UFP-QAPP) for Site Characterization at 14 Former POL Sites, Eareckson Air Station, Shemya Island, Alaska. The conditions for the UFP-QAPP are as follows: 1) We do not object to the long term monitoring work being completed as outlined in the UFP-QAPP; however ADEC cannot concur that efforts will be counted towards meeting the end point criteria outlined in the decision documents until an adequate monitoring program has been established. 2)The QAPP states that field screening results and field observations will be used to determine additional groundwater monitoring well locations. These locations should to be coordinated with ADEC. 3) The leaking underground storage tank (LUST) sites at Eareckson Air Station will need to be characterized and closed in accordance with LUST regulations that are included in 18 AAC 78. 4) The scope of work for this investigation may not be sufficient to fully characterize the sites listed in the work plan, and additional investigation may be necessary. |
Jessica Morris |
11/14/2016 |
Site Visit |
ADEC staff travelled to Eareckson Air Station for 4 days to conduct site visits and become familiar with the ecology and topography of the island. Site visits were conducted to all pertinent sites and meetings were held to with ADEC and USAF to discuss a path forward for the sites. |
Jessica Morris |
3/31/2017 |
Document, Report, or Work plan Review - other |
The ADEC Contaminated Sites Program approved the Final UFP-QAPP Site Investigation for Perfluorinated Compounds and Long Term Management Studies, Eareckson Air Station. The work plan was approved with the condition that the monitoring program proposed was not sufficient to meet the requirements in the RODs. ADEC requires a work plan for remedy implementation to establish an adequate monitoring program. |
Jessica Morris |
11/27/2017 |
Site Visit |
ADEC staff travelled to Eareckson Air Station for 3 days to conduct site visits and institutional control inspections. Site visits were conducted to all pertinent sites and meetings were held to with ADEC and USAF to discuss a path forward for the sites. |
Jessica Morris |
2/23/2018 |
Document, Report, or Work plan Review - other |
The ADEC Contaminated Sites Program provide comments on the Draft Site Characterization Report at 13 Former POL Sites, Phase I, Eareckson Air Station. |
Jessica Morris |
5/2/2018 |
Document, Report, or Work plan Review - other |
The ADEC Contaminated Sites Program submitted comments on the Draft Remedial Process Optimization Report for Eareckson Air Station. The purpose of the report was to present an evaluation of the effectiveness of the current selected site remedies and make recommendations for optimization of an island-wide monitoring and management program for contaminated sites at Eareckson. ADEC had numerous comments on the document, and requested a project team meeting to further discuss a more effective and efficient program at Eareckson. |
Jessica Morris |
1/8/2019 |
Institutional Control Compliance Review |
The Alaska Department of Environmental Conservation (ADEC) Contaminated Sites Program received a copy of the Final Long Term Monitoring and Institutional Controls Inspection Report for Eareckson Air Station. The report is accepted as final documentation of the field activities. The report is approved with the conditions noted in the ADEC’s comments 1/8/19 letter.
The field efforts completed are not considered sufficient to meet the overall long term monitoring requirements outlined in the site records of decision and regulations for closure end point criteria. ADEC is working with the USAF to develop a more efficient island-wide long term monitoring strategy for Eareckson Air Station. |
Jessica Morris |
7/5/2019 |
CERCLA ROD Periodic Review |
DEC provided comments to the U.S. Air Force on the "Five-Year Review Report and Period Review for Eareckson Air Station, Shemya Island, Alaska, Draft” dated November 2018 on July 5, 2019. |
Melinda Brunner |
10/9/2019 |
Update or Other Action |
Approved 2019 Remedial Action Operations, land Use/Institutional Control Supplemental Work Plan. |
William Schmaltz |
6/25/2020 |
Document, Report, or Work plan Review - other |
The purpose of this project is to continue environmental long-term management at multiple sites at Eareckson AS, Alaska. The objectives of this project were to conduct groundwater sampling at eight sites, surface water sampling at four sites, sediment sampling at three sites, conduct IC inspections at 19 sites, and conduct an assessment of necessary repairs at LF026. The assessment of LF026 is documented in a separate technical memorandum; this LTM report presents the findings of the IC inspections and the results of groundwater, surface water, and sediment sampling. |
Darren Mulkey |
6/25/2020 |
Document, Report, or Work plan Review - other |
"Draft Technical Project Report, 2019 Environmental Long Term Management Activities, Eaceckson Air Station, Sites FT001, FT002, FT003, OT048, SS007, SS010, SS023, SS025, ST009, ST035, ST039, ST044, ST046, ST050, ST051, LF015, LF018, LF024, and LF026, May 2020". The purpose of this project is to continue environmental long-term management at multiple sites at Eareckson AS, Alaska. The objectives of this project were to conduct groundwater sampling at eight sites, surface water sampling at four sites, sediment sampling at three sites, conduct IC inspections at 19 sites, and conduct an assessment of necessary repairs at LF026. The assessment of LF026 is documented in a separate technical memorandum; this LTM report presents the findings of the IC inspections and the results of groundwater, surface water, and sediment sampling. |
Darren Mulkey |
6/25/2020 |
Institutional Control Periodic Reporting |
2019 Technical Project Report. The purpose of this project is to continue environmental long-term management at multiple sites
at Eareckson AS, Alaska. The objectives of this project were to conduct groundwater sampling
at eight sites, surface water sampling at four sites, sediment sampling at three sites, conduct IC
inspections at 19 sites, and conduct an assessment of necessary repairs at LF026. The
assessment of LF026 is documented in a separate technical memorandum; this LTM report
presents the findings of the IC inspections and the results of groundwater, surface water, and
sediment sampling. |
Darren Mulkey |
8/20/2021 |
Update or Other Action |
On August 19, 2021 ADEC approved the Final Uniform Federal Policy for Quality Assurance Project Plan for Long-Term Management and Remedial Action Operation Activities for Eareckson Air Force Station, Alaska, Dated August 2021.
This quality assurance project plan explains the conceptual site model, defines the long term management and remedial action operation inspection activities to be completed at each site, and specifies the quality control and quality assurance aspects of the monitoring and inspection program.
|
Daniela Fawcett |
4/27/2022 |
Update or Other Action |
On 4/27/2022 ADEC approved the Eareckson Air Station, Alaska, REMEDIAL PROCESS OPTIMIZATION REPORT dated April 2022.
This Remedial Process Optimization (RPO) Report presents an evaluation of the effectiveness of current selected site remedies and makes recommendations for optimization of the IWM Program, as appropriate to establish a more integrated groundwater monitoring program at Eareckson AS. RPO is a systematic approach for evaluating and improving the effectiveness of site remediation without increasing site risk. This RPO Report presents a site-by-site evaluation of effectiveness of the sites selected remedy and provides recommendations to:
• Streamline groundwater monitoring.
• Develop a holistic approach to site management.
• Maintain the remedial action objectives (RAOs) set forth in established Record of Decisions (RODs) and Decision Documents (DDs).
|
Daniela Fawcett |
4/21/2023 |
Document, Report, or Work plan Review - other |
DEC received a revised Notice of Intent (NOI) APDES Excavation Dewatering General Permit and Best Management Practice Plan: General Permit for Excavation Dewatering. The purpose of the construction project is to provide professional services to repair and replace approximately 4,000 linear feet of the existing waste heat loop system on Shemya Island. The lines requiring replacement are approximately 3-4 feet deep and will be dug up with an excavator. Petroleum contamination at nearby ST09 is not expected to impact this project. If contamination or unexpected site conditions are encountered, the U.S. Air Force and DEC will be notified. DEC Contaminated Sites provided review comments on March 17, 2023 which were appropriately addressed in the revised documents provided on April 18, 2023. |
Erica Blake |
6/27/2023 |
Document, Report, or Work plan Review - other |
DEC provided comments for the Draft Final 2021 Long Term Management, Land Use and Institutional Controls Report Eareckson Air Station, Shemya, Alaska Sites CS566, DA002/DA002A, DA003, FT001, FT002, FT003, LF015, LF018, LF024, LF026, ML001, MU001, OD001, OT048, OT617, PL560, PL575, SS005, SS007, SS010, SS012, SS023, SS025, ST009, ST035, ST039, ST044, ST046, ST050, ST051, TA555, TA556, TA616, TU553, TU554, TU558, TU559, TU567, TU568, XU912, ZZ001, dated June 2023.The report describes the institutional control inspections and sampling efforts conducted during November 15 through November 30th, 2021. Forty-two different sites were investigated at the Eareckson Air Station located on Shemya Island, Alaska. Groundwater was sampled at nine sites, surface water was sampled at five sites, and sediment sampling was conducted at two sites. Contaminants above cleanup levels remain present at most sites with stable or non-discernable trends. Most land use controls appear to be in good condition and Monitoring and continued inspections were recommended for all sites. |
Ginna Quesada |
7/3/2023 |
Document, Report, or Work plan Review - other |
DEC submitted responses to comments for the Draft Final 2021 Long Term Management, Land Use and Institutional Controls Report Eareckson Air Station, Shemya, Alaska Sites CS566, DA002/DA002A, DA003, FT001, FT002, FT003, LF015, LF018, LF024, LF026, ML001, MU001, OD001, OT048, OT617, PL560, PL575, SS005, SS007, SS010, SS012, SS023, SS025, ST009, ST035, ST039, ST044, ST046, ST050, ST051, TA555, TA556, TA616, TU553, TU554, TU558, TU559, TU567, TU568, XU912, ZZ001, dated June 2023. |
Ginna Quesada |
8/3/2023 |
Long Term Monitoring Workplan or Report Review |
DEC approved the "Final 2021 Long Term Management, Land Use and Institutional Controls Report Eareckson Air Station, Shemya, Alaska Sites CS566, DA002/DA002A, DA003, FT001, FT002, FT003, LF015, LF018, LF024, LF026, ML001, MU001, OD001, OT048, OT617, PL560, PL575, SS005, SS007, SS010, SS012, SS023, SS025, ST009, ST035, ST039, ST044, ST046, ST050, ST051, TA555, TA556, TA616, TU553, TU554, TU558, TU559, TU567, TU568, XU912, ZZ001, dated July 2023." The report recommends continuing with land-use control site inspections and monitoring the groundwater until all remedial objectives are met. |
Erica Blake |