Skip to content Skip to content

Site Report: King Salmon AS GWZ 2 DA034 Gravel Fill Pad

Site Name: King Salmon AS GWZ 2 DA034 Gravel Fill Pad
Address: DA034 in Ground Water Zone 2, King Salmon, AK 99613
File Number: 2569.38.016.09
Hazard ID: 4521
Status: Cleanup Complete
Staff: No Longer Assigned, 9074655229 dec.icunit@alaska.gov
Latitude: 58.693611
Longitude: -156.655278
Horizontal Datum:NAD83

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

This site is located in the northeastern part of Ground Water Zone 2 and was identified using historic aerial photographs depicting a trench and fill as well as a horizontal tank. Groundwater flow is suspected to flow to the north towards Eskimo Creek and two groundwater monitoring wells are located approximately 500 feet to the south associated with soil treatment cells. One sample returned a DRO concentration above the cleanup level with a concentration of 572 mg/kg. Surface water and sediment samples collected north of the site in Eskimo Creek had no sample results above the cleanup levels. Additional sampling will be requred to determine the nature and extent of the contamination in the vicinity of the sample that had a DRO concentration above the cleanup level. AF point of contact: Charley Peyton, Project Manager, 611th CES/CEV 10471 20th Street Suite 338, Elmendorf AFB, AK 99506-2270; Telephone 907-552-9765.

Action Information

Action Date Action Description DEC Staff
12/11/2007 Site Added to Database Site added to the database. Mitzi Read
12/12/2007 Exposure Tracking Model Ranking Initial ranking with ETM completed. Jonathan Schick
10/21/2008 Site Visit ADEC staff took part in a site visit to a number of pertinent sites at King Salmon Air Station over a 2 day visit. Sites, especially the pending Multi Site Inspection sites, were inspected for any visible evidence of contamination and potential sampling locations as the work plans are still being formulated. ADEC staff was accompanied to all of the sites by the Project managers from the USAF and thier contractors. A Restoration Advisory Board meeting was held during the site visit. The topics discussed included the most recent basewide monitoring program, a discussion of the Multi-SIte inspection project, an update on the status of the Groundwater Zone 5 Records of Decision, and a brief discussion concerning the TCE treatibility Study in Groundwater Zone 1. The next RAB meeting has been tentatively scheduled for April 21, 2009. Jonathan Schick
1/30/2009 Update or Other Action ADEC Staff recieved a copy of the Work Plan, Field Sampling Plan, and Quality Assurrance Project Plan for the Mulit-Site Inspection at King Salmon. The Work Plan is dated January 27, 2009. The Field Sampling Plan and the Quality Assurance Project Plan are dated January 16, 2009. Jonathan Schick
4/21/2009 Update or Other Action ADEC staff conducted a site visit to pertinent sites at King Salmon Air Station over a 2 day visit. Sites were inspected for any visible evidence of contamination and to become more familiar with the layout and topography of the area. ADEC staff was accompanied to all of the sites by the Project manager from the USAF and thier contractors. A Restoration Advisory Board meeting was held during the site visit. The topics discussed included the most recent basewide monitoring program, a discussion of the Multi-Site inspection project which is entering Phase II this summer, an update on the status of the Groundwater Zone 5 Records of Decision, and a brief discussion concerning the TCE treatibility Study in Groundwater Zone 1. The next RAB meeting has been tentatively scheduled for October, 2009. Jonathan Schick
3/23/2010 Update or Other Action ADEC staff recieved a copy of the Draft Report for Mulitple Site Inspections which included reports from additional site investigatins at Sites DA031, DA034, SA036, DA037, SA039, SA043, and SA006. Work was performed by Paug-Vik and its subcontractors under the Environmental Restoration Program for the US Air Force. Jonathan Schick
10/4/2011 Document, Report, or Work plan Review - other Contamianted Sites Staff submitted a letter to the Air Force's Remedial Project Manager regarding the Draft Work Plan for Excavation at DA034. The plan did not offer a specific action level for the screening tools that were proposed to be used at the site to segregate the clean overburden soil from the impacted soil for disposal purposes. ADEC requested that an action level be determined and included in the plan before it can be finalized and implemented in the field. Jonathan Schick
10/6/2011 Document, Report, or Work plan Review - other Contaminated Sites staff recieved responses to our comments on the Draft Work Plan for excavation work at DA034 to remove the DRO and RRO contamination that is present in the subsurface soils. The responses to our comments addressed the concerns and the plan should be finalized. Jonathan Schick
10/11/2011 Document, Report, or Work plan Review - other Contaminated Sites Staff submitted a letter to the US Air Force Remedial Project Manager approving the finalization of the work plan for Site DA034 for the removal of DRO and RRO impacted soil. Jonathan Schick
12/6/2012 CERCLA Proposed Plan Submit comments to US Air Force on the Proposed Plan for DA031, DA034, and SA043. Comments were editorial in nature. Guy Warren
3/26/2013 CERCLA Proposed Plan Receive final Proposed Plan for site DA031, DA034 and SA043. A public meeting RAB will be held in April to discuss the proposed plan for these sites and to receive input from the affected public. Remedy for DA034 is to remove impacted soil from the areas of concern. Guy Warren
8/22/2013 Update or Other Action Received Draft Decision Document for DA031, DA034, and SA043. Submit comments requesting modification to the text of the document. Remedy for DA034 is to remove impacted soil from the areas of concern. Guy Warren
8/18/2014 Document, Report, or Work plan Review - other Submit comments to US Air Force on the Draft "Work Plans for 2014 Remedial Action Construction at King Salmon Divert". Comments were minor. Work is scheduled for 2014 and should complete the Decision Document required remedial action for this site. Guy Warren
9/2/2014 Document, Report, or Work plan Review - other Received Final Work Plan for 2014 Remedial Action Construction. Approval letter submitted 8/28/14 based on electronic submittal. Guy Warren
6/27/2016 Document, Report, or Work plan Review - other Approved the Final 2014 RA – Construction report. Work at this site has been completed, and it is recommended that site closure for DA034 be requested from ADEC. Holly Weiss-Racine
10/31/2016 Update or Other Action ADEC sent a letter requesting additional action on nine sites within the King Salmon Divert. DA034 was included requesting requesting the ROD be finalized and implemented. Holly Weiss-Racine
5/15/2018 Document, Report, or Work plan Review - other ADEC approves the 'Final 2017 Five-Year Review, King Salmon Divert, Naknek Recreation Camp I, Naknek Recreation Camp II, Alaska, November 2017' in a letter dated May 15, 2018. Land Use Controls have not been fully implemented at any groundwater zones at King Salmon Divert. Recommendations include: finalizing the decision document for Zone 7, determine the extent of drinking water wells at Lake Camp (number of wells, depth of wells, and groundwater gradient), and fully implement LUCs by updating public land records for non-USAF owned properties. The next five-year review will be completed in 2022. Sammi Castle
2/5/2020 Exposure Tracking Model Ranking A new updated ranking with ETM has been completed for source area 75508 Barrel Dump. Sammi Castle
5/21/2020 Cleanup Complete Determination Issued ADEC has determined that residual contamination at site DA034 does not pose unacceptable risk to human health or the environment. This site has been issued a 'Cleanup Complete' determination and is now closed. Sammi Castle

Contaminant Information

Name Level Description Media Comments
DRO < Method 2 Most Stringent Soil
RRO < Method 2 Most Stringent Soil
DRO < Table C Groundwater

Control Type

Type Details
No ICs Required

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.
Movement or use of contaminated material (including on site) in a manner that results in a violation of the water quality standards is prohibited (18 AAC 70)

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.
Continue     Close