Skip to content Skip to content

Site Report: JL Properties - 6301 Rosewood Street

Site Name: JL Properties - 6301 Rosewood Street
Address: 6301 Rosewood Street, Portions of Dowling & Murray Sudivisions, Anchorage, AK 99501
File Number: 2100.38.496
Hazard ID: 4634
Status: Active
Staff: Bill O'Connell, 9072693057 bill.oconnell@alaska.gov
Latitude: 61.163834
Longitude: -149.860774
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

Soil and groundwater contamination found at 8 locations on the property during a 2004 Phase II assessment. Up to 0.0661 mg/l benzene, 2.92 mg/l GRO, 2.87 mg/l DRO, and 2.60 mg/l RRO in the shallow groundwater. Up to 0.503 mg/kg benzene, 304 mg/kg GRO, 8,470 mg/kg DRO in soil. Extent of the soil and groundwater contamination not known. Site includes: Dowling Subdivision, Lots: 3C, 3D, 4C, 4D, 25A, 27A, 28A, 31, and 32; and Murray Subdivision, Lots: 1, 21, 22, 23, 24, and 24.

Action Information

Action Date Action Description DEC Staff
9/10/2007 Update or Other Action ADEC provides comments on the June 13, 2007 Work Plan For Cleanup Activities. The workplan proposes to excavate soil from some of the areas previously identified as being over cleanup levels, and install monitoring wells in some of the areas previously identified as having groundwater contamination. The RPs consultant is to provide a revised workplan. Robert Weimer
4/23/2008 Update or Other Action ADEC provides comments on the January 23, 2008 Revised Work Plan For Cleanup Activities. The workplan proposes to excavate soil from some of the areas previously identified as being over cleanup levels, and install monitoring wells in some of the areas previously identified as having groundwater contamination. Robert Weimer
5/15/2008 Site Added to Database Site added to the database. Mitzi Read
5/16/2008 Exposure Tracking Model Ranking Site ranked on the new Exposure Tracking Model (ETM). The ETM is a new site ranking system that looks at, based on available data, the potential exposure pathways for the contamination remaining at the site. Mitzi Read
6/22/2009 Update or Other Action ADEC provides comments regarding request to landspread as clean some of the soil excavated at the site. Those soils stockpiled soils need to be field screened and analytical sampled in accordance with an approved sampling plan, or be cosidered as contaminated for treatment. Robert Weimer
6/23/2009 Site Characterization Report Approved In August/September 2008 five test pits, one soil boring, and three monitoring wells were installed. A total of 75 cubic yards of contaminated soil was removed from the five test pits. Up to 112 mg/kg GRO, 488 mg/kg DRO, and 0.723 mg/kg benzene in the excavation soil samples collected. Some of the soil sample results are biased low because they we not properly preserved in the field. Up to 0.740 mg/l GRO, 1.98 mg/l DRO, 5.00 mg/l RRO, and 28 ug/l benzene in the groundwater samples collected. The 75 cubic yards of excavated soil is currently stockpiled on site in a 50 cubic yard and a 25 cubic yard stockpile. Additional site characterization, corrective action, and groundwater monitoring is needed. Robert Weimer
6/24/2009 Update or Other Action ADEC approves request for thermal treatment of 75 cubic yards of excavated soil that is currently stockpiled on site in a 50 cubic yard and a 25 cubic yard stockpile, and 1 drum of contaminated drill cuttings. Robert Weimer
10/28/2011 Update or Other Action To date no documentation that additional site characterization, corrective action, and groundwater monitoring have been provided. Robert Weimer
1/30/2014 Update or Other Action Project manager changed to Amy Dieffenbacher, transferred to Juneau Annie Ariel
9/30/2014 Potentially Responsible Party/State Interest Letter Telephone call to RP, left message on executive assistant's line. Mailed potentially responsible party (PRP) letter to RP. Amy Rodman
12/10/2014 Update or Other Action Received email from RP with 2009 AK Soil Recycling report re: excavated soil remediation status. Email requested site closure with "NFA/Clean up Complete" status. Amy Rodman
1/23/2018 Update or Other Action Site summary/work plan request letter emailed to RP. Updated deadline for work plan is May 18, 2018. Amy Rodman
5/24/2018 Site Characterization Workplan Approved Work plan approved with comments. Proposed activities generally consist of advancing two soil borings, field-screening soil with a photo-ionization detector (PID), installing two temporary groundwater monitoring wells, collecting soil and groundwater samples, decommissioning the temporary groundwater monitoring wells, laboratory analysis of soil and groundwater samples, and managing investigation-derived waste (IDW). Amy Rodman
11/8/2018 Site Characterization Report Approved ADEC reviewed and approved the “Report for Alaska Waste Rosewood Facility Site Characterization” (report) dated September 28, 2018 for the JL Properties – 6301 Rosewood Street site in Anchorage, AK. The report was submitted via email on October 11, 2018 by Restoration Science & Engineering, LLC. The described field effort was conducted on July 10, 2018 and generally consisted of advancing two soil borings, temporary groundwater monitoring well installation at each soil boring location, field-screening soil with a photo-ionization detector, and sample collection (soil and groundwater) for laboratory analysis. Amy Rodman

Contaminant Information

Name Level Description Media Comments

Control Type

Type Details

Requirements

Description Details

There are no documents for this site report.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.
Continue     Close