Site Report: Kalakaket Creek RRS - Drum Storage Areas 1 and 3 [OT001]
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
DRO was detected in surface soil at Drum Storage Area 1; to 2,860 mg/kg, trace detections of pesticides, PCBs and PAHs all below migration to groundwater Cleanup levels.
DRO was detected in surface soil at Drum Storage Area 3. Drum Storage Area 1 is located at upper camp near the Paint Storage and Vehicle Maintenace Buildings. Drum Storage Area 3 is located off the southeastern portion of the runway at lower camp.
The 2009 Clean Sweep excavated 195 square feet in the eastern area to a depth of 2 feet, and screening for DRO and RRO were below cleanup levels. In the western area, 429 square feet were excavated to a depth of 3 feet, and screening for DRO and RRO were below cleanup levels.
Action Information
Contaminant Information
Name |
Level Description |
Media |
Comments |
DRO |
Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation |
Soil |
|
Control Type
Type |
Details |
No ICs Required |
|
Requirements
Description |
Details |
Advance approval required to transport soil or groundwater off-site. |
|
There are no documents for this site report.
No associated sites were found.