Action Date |
Action |
Description |
DEC Staff |
8/29/1995 |
Update or Other Action |
(Old R:Base Action Code = RI - Remedial Investigation). Action date used is the date of the Air Force Relative Risk Evaluation Worksheet, which indicates the site is in the RI phase. |
Former Staff |
2/21/1997 |
Site Added to Database |
Site added by Shannon and Wilson. See also Reckey 198831X127201. |
S&W |
2/21/2003 |
Update or Other Action |
In 2003 work will be completed to characterize this site. Solvents have been detected in the groundwater near this site, but the source may be another area. |
Ann Farris |
9/17/2003 |
Update or Other Action |
Staff received the Draft Remedial Investigation/Feasibility Study Work Plan for Galena Airport. Staff has begun review of the document. A comment resolution/technical project team meeting is scheduled October 2-3rd in Anchorage. This work plan is intended to address the many outstanding site characterization issues that were raised by Louden Tribal Council, the Environmental Protection Agency, and ADEC as well as the Remedial Process Optimization Evaluation completed in 2002. |
Ann Farris |
4/19/2004 |
Meeting or Teleconference Held |
Staff participated in the 9th Galena Technical Project Team meeting on April 19th. The meeting was between representatives of the Air Force, Louden Tribal Council, City of Galena, Galena City School District, and the Alaska Department of Environmental Conservation. The primary objective of this meeting was to complete comment resolution on the the Draft Final Remedial Investigation/Feasibility Study Work Plan. The team did ultimately come to resolution on the work plan and the final version is expected out by mid-May. |
Ann Farris |
8/30/2004 |
Meeting or Teleconference Held |
11th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
10/21/2004 |
Meeting or Teleconference Held |
Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
11/5/2004 |
Meeting or Teleconference Held |
12th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
11/19/2004 |
Meeting or Teleconference Held |
Attended a week long meeting in San Antonio, Texas to participate in the formulation of an outline for the Galena Airport and Campion Air Station Remedial Investigation/Feasibility Study (RI/FS). |
Colin Craven |
1/12/2005 |
Update or Other Action |
Submitted comments to the Air Force to finalize the 2004 Site Recommendations for the upcoming Remedial Investigation report. The 2004 Site Recommendations were produced during the November 2004 meetings in San Antonio, Texas. |
Colin Craven |
1/28/2005 |
Meeting or Teleconference Held |
Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
1/28/2005 |
Meeting or Teleconference Held |
13th Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
4/19/2005 |
Meeting or Teleconference Held |
14th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
4/26/2005 |
Meeting or Teleconference Held |
Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
5/13/2005 |
Meeting or Teleconference Held |
15th Galena Technical Project Team meeting in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
6/9/2005 |
Meeting or Teleconference Held |
16th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
7/20/2005 |
GIS Position Updated |
Updated the site location; interpolated from USGS quadrangle map. |
Colin Craven |
8/29/2005 |
Update or Other Action |
The Air Force requested closure on the site based on samples collected during a geotechnical survey performed in the area, however, closure not possible due to the site due to the presence of BTEX, DRO, and TCE above cleanup levels with no documented removal or remedial action. The Air Force decided to have the Compliance program handle the Waste Accumulation Area, despite the former Installation Restoration Program listing of the site. |
Colin Craven |
8/30/2005 |
Meeting or Teleconference Held |
17th Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
10/12/2005 |
Meeting or Teleconference Held |
Galena RAB meeting. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
10/20/2005 |
Meeting or Teleconference Held |
18th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
1/26/2006 |
Meeting or Teleconference Held |
19th Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
3/14/2006 |
Meeting or Teleconference Held |
20th Galena Technical Project Team in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
6/20/2006 |
Meeting or Teleconference Held |
21st Galena Technical Project Team in Galena. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
10/6/2006 |
Meeting or Teleconference Held |
22nd Galena Technical Project Team meeting in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
11/17/2006 |
Meeting or Teleconference Held |
23rd Galena Technical Project Team meeting in Fairbanks. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
1/18/2007 |
Meeting or Teleconference Held |
24th Galena Technical Project Team meeting in Anchorage. See the "Galena AFS - Sitewide" listing for more details. |
Colin Craven |
6/28/2010 |
Meeting or Teleconference Held |
TPT meeting, site discussed |
Fred Vreeman |
8/1/2010 |
Document, Report, or Work plan Review - other |
SC work plan reviewed |
Fred Vreeman |
8/11/2010 |
Site Characterization Workplan Approved |
SC work plan approved |
Fred Vreeman |
8/11/2010 |
Conceptual Site Model Submitted |
CSM submitted |
Amanda Loomis |
9/1/2010 |
Site Visit |
Site visit, field work audit |
Amanda Loomis |
4/15/2011 |
Document, Report, or Work plan Review - other |
Step out Memo reviewed |
Fred Vreeman |
4/30/2011 |
Update or Other Action |
Stepout Memo approved. |
Fred Vreeman |
6/9/2011 |
Site Visit |
Site visit, field work audit |
Fred Vreeman |
6/21/2011 |
Meeting or Teleconference Held |
TRIAD meeting, sampling data discussed. |
Fred Vreeman |
7/8/2011 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 71544 name: auto-generated pm edit Galena AFS - Waste Accumulatn. Area |
Amanda Loomis |
8/16/2011 |
Meeting or Teleconference Held |
TRIAD meeting held. DEC agrees that nature and extent investigation is complete. |
Fred Vreeman |
5/15/2012 |
Document, Report, or Work plan Review - other |
DEC received a Draft Remedial Investigation Results Report for AOC023. |
Dennis Shepard |
7/19/2012 |
Document, Report, or Work plan Review - other |
DEC provided review comments for the Draft Remedial Investigation report for AOC023. DEC expressed concern about the Risk Assessment methodology used to evaluate the site. Risk assessment issues resolution meetings are being planned. |
Dennis Shepard |
8/1/2012 |
Meeting or Teleconference Held |
Risk assessment issues resolution meetings were held at DEC offices in Anchorage, Alaska. The site AOC023 risk assessment methodology was discussed. |
Dennis Shepard |
8/1/2012 |
Meeting or Teleconference Held |
Risk assessment issues resolution meetings were held at DEC offices in Anchorage, Alaska. The site AOC023 risk assessment methodology was discussed. Issues requiring resolution require EPA weigh in on Exposure Point Concentration (EPC) calculations. Air Force agrees to resample some locations where Data Quality is questioned (surrogate recovery issues). |
Dennis Shepard |
9/4/2012 |
Document, Report, or Work plan Review - other |
Additional comments on Risk Assessment issues were provided. |
Dennis Shepard |
11/6/2012 |
Document, Report, or Work plan Review - other |
Air Force submitted resampling results and Technical Memo for Pesticides at AOC023. |
Dennis Shepard |
11/8/2012 |
Meeting or Teleconference Held |
A meeting was conducted with DEC Staff and contractor Shannon and Wilson to identify all remaining data gaps in the site characterization for all Galena Sites including AOC023. |
Dennis Shepard |
2/6/2013 |
Document, Report, or Work plan Review - other |
ADEC received a Draft Final remedial investigation results report for the site. |
Dennis Shepard |
3/13/2013 |
Document, Report, or Work plan Review - other |
ADEC provided review comments and completed a backcheck of the Air Force response to comments for the Draft Final Remedial Investigation results report for Site AOC023 |
Dennis Shepard |
3/13/2013 |
Document, Report, or Work plan Review - other |
ADEC provided a letter of concurrence with recommendations from a Technical Memorandum concerning re-sampling of pesticides at four locations within the AOC023 site boundaries. ADEC had asked for the re-sampling due to quality control issues in the original laboratory results. |
Dennis Shepard |
6/14/2013 |
CERCLA RI Report Approved |
The Alaska Department of Environmental Conservation (ADEC) received a Draft Remedial Investigation (RI) results report for Site AOC023, Former Galena FOL, on May 15, 2012. ADEC provided comments for the draft report on July 19, 2012 and sent some additional risk assessment comments on August 30, 2012. On February 6, 2013, ADEC received a response to comments (RTC) and a Draft Final RI results report for Site AOC023. ADEC reviewed the Draft Final RI results report and completed a backcheck of the RTC. ADEC provided comments for the Draft Final on March 13, 2013. In order to address ADEC concerns and to reach agreements on a path forward for the risk assessments at Galena RI Sites, a risk scoping meeting for the Former Galena FOL, Alaska was held from 20 to 21 March 2013 in Austin, Texas. An additional teleconference meeting was held on May 8, 2013 to discuss remaining issues for the report.
An approval of the Draft Final Remedial Investigation (RI) results report was provided on June 14, 2013.
|
Dennis Shepard |
4/15/2014 |
Meeting or Teleconference Held |
A Technical Project Team meeting was held to meet the Air Force newly selected Performance Based Remediation Contractor for Galena. The 6.5 year remediation contract was awarded to Parsons Governmental Services (Parsons). The contract includes completing the risk assessments, remediation feasibility studies, proposed plans and record of decision for remedial investigations at 10 Sites (FT001, SS006, SS013, SS015, SS019, SS018/AOC023, SS022/B400, DP023/DSWD, OW024/OWS1833, and SS025). |
Dennis Shepard |
3/4/2015 |
Risk Assessment Report Approved |
DEC approved the Human Health Risk Assessment, Waste Accumulation Area (Site AOC023), Former Galena Forward Operating Location (FOL), Alaska. |
Dennis Shepard |
7/29/2015 |
Document, Report, or Work plan Review - other |
DEC approved the Pipe Verification and Surface Tar Removal Work Plan, Former Galena Forward Operating Location (FOL), Alaska. |
Dennis Shepard |
9/29/2016 |
CERCLA FS |
DEC approved for the Feasibility Study Report for Waste Accumulation Area AOC023(Site SS018), |
Dennis Shepard |
10/20/2016 |
CERCLA Proposed Plan |
DEC approved the Proposed Plan Air Force Proposes Environmental Restoration Alternatives for Waste Accumulation Area (Site SS018) with Soil and Groundwater Impacts, Former Galena Forward Operating Location (FOL), Alaska. |
Dennis Shepard |
10/26/2016 |
Meeting or Teleconference Held |
A restoration advisory board (RAB) meeting was held in Galena. Prior to the RAB meeting,Proposed plans were presented for sites Fire Protection Training Area (FT001), Waste Accumulation Area (SS018) and West Perimeter Road TCE Spill (SS025). |
Dennis Shepard |
10/26/2016 |
Meeting or Teleconference Held |
A restoration Advisory board meeting was held in Galena Alaska to discuss the general and specific status of site investigations and cleanup at Galena. |
Dennis Shepard |
8/3/2017 |
CERCLA ROD Approved |
Approval of the Record of Decision (ROD) for the Waste Accumulation Area. |
Jamie McKellar |
3/6/2018 |
Update or Other Action |
DEC received the signed ROD signature page from USAF. It was signed by DEC on 3/6/2018. |
Jamie McKellar |
8/8/2018 |
Site Visit |
DEC conducted a site visit at the Former Forward Operating Location in Galena, AK on August 8-9, 2018. A photo log is available in DEC's electronic file. |
Jamie McKellar |
10/29/2018 |
Site Visit |
On October 23, 2018, DEC participated in the Technical Project Team (TPT) meeting with representatives from USAF and ADOT&PF. A site visit with inspections of each site was conducted the following day (10/24/2018) in Galena, as well as a regional advisory board (RAB) meeting with members of the community and other interested parties. |
Jamie McKellar |
4/5/2019 |
Site Visit |
On April 2, 2019, DEC staff participated in a Technical Project Team meeting with representatives from USAF, Parsons, CH2M, and ADOT. The TPT meeting was held at the Fairbanks DEC office. On April 3-4, 2019, DEC staff traveled to Galena to participate in meetings with the City Mayor & RAB chair to discuss community concerns about site cleanup; a Proposed Plan meeting for Site DP023, and a community regional advisory board (RAB) meeting to discuss fieldwork completed during the 2018 field season and upcoming 2019 fieldwork. Site visits were also conducted. |
Jamie McKellar |
10/23/2019 |
Meeting or Teleconference Held |
On October 22, 2019, DEC participated in the Technical Project Team (TPT) meeting with representatives from USAF and ADOT&PF. A site visit was conducted the following day (10/23/2019) in Galena, as well as a regional advisory board (RAB) meeting with members of the community and other interested parties. |
Jamie McKellar |
10/30/2019 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: Final 2018 Performance Monitoring Report for Sites CPL006, CSS002, OW024, SS006/SS019, SS014/SS017, SS015, SS016, SS018, SS022, SS025, ST009, ST010, and FT001, Former Galena Forward Operating Location, Alaska (Parsons, October 2019) |
Jamie McKellar |
5/21/2020 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: Final Construction Completion Report for Waste Accumulation Area (Site SS018) Subarea 5, Former Galena Forward Operating Location, Alaska (Parsons, May 2020) |
Jamie McKellar |
3/2/2021 |
Document, Report, or Work plan Review - other |
WORK PLAN APPROVED: Final Supplemental Site Characterization Work Plan for Waste Accumulation Area (Site SS018), Former Galena Forward Operating Location, Alaska (Parsons, February 2021) |
Jamie McKellar |
4/21/2021 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: 2020 Performance Monitoring Report for Sites CPL006, CSS002, SS006/SS019, SS017, SS015, SS016, SS018, SS022, ST009, ST010, and FT001, Former Galena Forward Operating Location, Alaska (Parsons, April 2021) |
Jamie McKellar |
8/29/2022 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: Final Supplemental Site Characterization Report for Waste Accumulation Area (Site SS018). During the 2021 field activities, soil boring SS018_GP016, exceeded the 18 AAC 75 Table B1 Human Health cleanup level for trichloroethylene (TCE; 4.9 mg/kg) with a concentration of 2.6 J mg/kg. This TCE exceedance, collected at 6 to 8 feet below ground surface, is associated with a release at Site SS018 Area 2 and will be addressed as part of the remedy for that subarea. |
Jamie McKellar |
8/23/2023 |
Document, Report, or Work plan Review - other |
REPORT APPROVED: Final Remedial Process Optimization Evaluation Report, Former Galena Forward Operating Location, Alaska (Parsons, June 2023) |
Jamie McKellar |
9/14/2023 |
Document, Report, or Work plan Review - other |
WORK PLAN APPROVED: Final Addendum 3 to Work Plan for Remedial Process Optimization Technical Memorandum, Former Galena Forward Operating Location, Alaska (Parsons, September 2023) |
Jamie McKellar |
11/15/2023 |
Site Visit |
DEC, DOT, USAF, and contractors met at the Fairbanks DEC office on May 2, 2023 for a Technical Project Team meeting. The following day a site visit and Regional Advisory Board (RAB) meeting were held in Galena. Meeting minutes for the TPT and RAB meetings were approved on November 15, 2023. |
Jamie McKellar |
4/23/2024 |
Meeting or Teleconference Held |
CS staff participated in the biannual Technical Project Team (TPT) meeting with representatives from USAF BRAC, Parsons, Jacobs/CH2M Hill, and EA Engineering. The meeting was held at the EA Engineering office in Anchorage, AK. |
Jamie McKellar |
6/26/2024 |
Document, Report, or Work plan Review - other |
DEC Approved the Final Addendum 4 to Work Plan for Remedial Process Optimization at the Former Galena Forward Operating Location on this date. |
Tim Sharp |
6/27/2024 |
Document, Report, or Work plan Review - other |
DEC approved multiple data quality assessment reports for soil, soil vapor, groundwater, and sediment. Reports were submitted by Parsons and CH2M/Jacobs. Approval letter is dated 6/27/2024. |
Jamie McKellar |