Action Date |
Action |
Description |
DEC Staff |
10/1/1981 |
Preliminary Assessment Approved |
"Installation Restoration Program Records Search For Alaska DEW Line Stations" completed by CH2M Hill for Air Force dated 10/1/92. Identifies possible contaminated sites. |
Former Staff |
1/1/1990 |
Site Added to Database |
Possible contaminants include unknown quantities of petroleum products, halogenated solvents. |
Former Staff |
8/12/1991 |
Update or Other Action |
(Old R:Base Action Code = FI - Field Inspection (General)). Staff performed site inspection. |
Cindy Thomas |
8/14/1991 |
Site Ranked Using the AHRM |
Initial ranking. Value = 6. |
Former Staff |
9/1/1991 |
Update or Other Action |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). Remedial Action Plan reviewed by staff. |
Cindy Thomas |
12/10/1992 |
Meeting or Teleconference Held |
ADEC staff met with Air Force to discuss workplan for summer 1993 RI/FS at all seven active Dewline stations. |
Former Staff |
2/18/1993 |
Meeting or Teleconference Held |
ADEC staff facilitated meeting between Navy, Air Force, and Army Corps of Engineers to plan cooperative work at co-located sites such as NARL and POW Main Dewline and Wales, Tin City, and Saint Lawrence Island. |
Former Staff |
7/9/1993 |
Update or Other Action |
(Old R:Base Action Code = RI - Remedial Investigation). ADEC received Draft Workplan and Draft Sampling and Analysis Plan for Remedial Investigations/Feasibility studies at Air Force Radar Stations from Air Force. |
Laura Noland |
7/27/1993 |
Meeting or Teleconference Held |
ADEC staff met with Air Force and their contractor, ICF Technology, Inc., to decide which sites will be addressed through the RI/FS project and which will be handled as environmental compliance problems. ADEC granted verbal approval to proceed with workplan as described and amended at meeting. |
Laura Noland |
8/2/1993 |
Site Characterization Workplan Approved |
(Old R:Base Action Code = RI - Remedial Investigation). Completed review of all work plan documents associated with planned RI/FS activities to be 8/1993. |
Laura Noland |
8/5/1993 |
Update or Other Action |
(Old R:Base Action Code = RI - Remedial Investigation). ADEC received Draft Final Sampling and Analysis Plan for Remedial Investigations/Feasibility studies at Air Force Radar Stations from Air Force. Work to be performed by ICF Technology, Inc. |
Laura Noland |
8/13/1993 |
Update or Other Action |
(Old R:Base Action Code = CORR - Correspondence (General)). Sent comments concerning RI/FS work plan and approving workplan. Also requested meeting with Air Force to discuss and resolve environmental compliance issues at the facilities. |
Laura Noland |
8/13/1993 |
Update or Other Action |
(Old R:Base Action Code = CORR - Correspondence (General)). ADEC request immediate attention to lack of documentation to support USAF statement that seven sites are closed areas of concern. USAF has agreed to investigate before field work begins. |
Laura Noland |
9/2/1993 |
Update or Other Action |
(Old R:Base Action Code = FI - Field Inspection (General)). Noland/Markey: Staff conducted an informal inspection of screening lab located at NARL for the Dewline Station Remedial Investigation sampling effort. Also conducted inspection of 3 contaminated site areas which the USAF sampling plan will address. |
Laura Noland |
9/9/1993 |
Meeting or Teleconference Held |
Conducted meeting at NRO offices with Air Force and contractor Martin Marietta to discuss environmental compliance issues which may be contributing or causing contaminated sites at the Dewline Stations. Discussions centered on identifying problem areas and devising solutions. Issues include landfills, miscellaneous solid waste, abandoned drums, tanks and pipelines and abandoned transformers. |
Laura Noland |
11/1/1993 |
Update or Other Action |
(Old R:Base Action Code = CORR - Correspondence (General)). Received letter from Air Force addressing compliance and contaminated site issues at seven Dewline Stations and Cape Lisburne LRRS. Issues concern solid waste, wastewater, oil spill and contaminated sites programs. Letter copied to all programs for follow-up. |
Laura Noland |
1/14/1994 |
Update or Other Action |
(Old R:Base Action Code = PUBP - Public Participation)). Reviewed and provided comments for Draft Final Community Relations Plan for Barter Island, Bullen Point, Oliktok, Point Lonely, Point Barrow, Wainwright, Point Lay, and Cape Lisburne dated 12/17/93 and conducted by the Air Force. |
Laura Noland |
3/1/1994 |
Meeting or Teleconference Held |
Met with Air Force and contractor ICF Kaiser to discuss current status of RI/FS, sampling results and risk assessment assumptions. Primary contaminant is DRO in soil and water. |
Laura Noland |
5/27/1994 |
Update or Other Action |
(Old R:Base Action Code = RPL2 - Site Information Request Letter). Sent PRP-CS Database Notification Letter to RP requesting update and more environmental information concerning contaminated site. |
Jeff Peterson |
2/20/1996 |
Update or Other Action |
(Old R:Base Action Code = TRET - Treatment, Selection). Received "Technical Memorandum results of the Treatability Study." |
Kalu Kalu |
2/27/1996 |
Risk Assessment Report Approved |
Received "FINAL" Risk Assessment. |
Kalu Kalu |
2/27/1996 |
Update or Other Action |
(Old R:Base Action Code = RI - Remedial Investigation). "FINAL" Remedial Investigation and Feasibility Study received. |
Kalu Kalu |
5/29/1996 |
Update or Other Action |
(Old R:Base Action Code = DD - Decision Document (CERCLIS)). Final Decision Document for No Further Response Action Planned, Point Barrow Radar Installation, Alaska, received 6/27/1996. |
Kalu Kalu |
9/20/1996 |
Update or Other Action |
(Old R:Base Action Code = RI - Remedial Investigation). Draft, Analytical Data Summary for Remedial Investigations at Air Force Radar Stations, document dated September 2, 1994. |
Kalu Kalu |
3/24/1997 |
Update or Other Action |
Site updated by Shannon and Wilson, based on the Air Force Relative Risk Evaluation Worksheets dated 9/3/95. The garage and diesel fuel spill have not been assigned separate Reckey numbers (per Kalu 1/23/97). |
S&W |
4/8/1999 |
Meeting or Teleconference Held |
DEC staff Tamar Stephens attended Barrow Restoration Advisory Board meeting. |
Tamar Stephens |
7/15/1999 |
Meeting or Teleconference Held |
DEC staff Tamar Stephens attended Barrow Restoration Advisory Board Meeting |
Tamar Stephens |
8/24/1999 |
Update or Other Action |
Stephens briefed section manager on 1996 NFRAP Decision Document for Diesel Fuel Spill. Concurred that site can be closed. Need to update Decision Document to show that site meets Method 2 cleanup levels, and update signature page to current signatories. |
Tamar Stephens |
11/4/1999 |
Meeting or Teleconference Held |
DEC staff Tamar Stephens attended Barrow Restoration Advisory Board Meeting |
Tamar Stephens |
12/17/1999 |
Update or Other Action |
Section Manager Jennifer Roberts signed decision document to close the Diesel Fuel Spill site (SS01). Some DRO remains, but site meets Method 2 cleanup levels. |
Tamar Stephens |
2/24/2000 |
Meeting or Teleconference Held |
DEC staff Tamar Stephens attended Barrow Restoration Advisory Board Meeting |
Tamar Stephens |
5/24/2000 |
Meeting or Teleconference Held |
DEC staff Tamar Stephens attended Barrow Restoration Advisory Board Meeting |
Tamar Stephens |
10/6/2000 |
Site Number Identifier Changed |
Changed the Region from 36 to 31. |
Former Staff |
1/18/2001 |
Meeting or Teleconference Held |
DEC staff Tamar Stephens attended Barrow Restoration Advisory Board Meeting |
Tamar Stephens |
4/12/2001 |
Meeting or Teleconference Held |
DEC staff Tamar Stephens attended Barrow Restoration Advisory Board Meeting |
Tamar Stephens |
2/21/2002 |
Meeting or Teleconference Held |
DEC staff Tamar Stephens attended Barrow Restoration Advisory Board Meeting |
Tamar Stephens |
9/19/2002 |
Meeting or Teleconference Held |
DEC staff Tamar Stephens attended Barrow Restoration Advisory Board Meeting |
Tamar Stephens |
11/7/2002 |
Meeting or Teleconference Held |
DEC staff Tamar Stephens attended Barrow Restoration Advisory Board Meeting |
Tamar Stephens |
6/16/2005 |
Update or Other Action |
T. Stephens reviewed and sent comments on a draft work plan for cleanup of petroleum and polychlorinated biphenyl (PCB ) contaminated soil at the Garage Site. Soil underneath the garage is contaminated as a result of past usage of floor drains that discharged directly to the ground under the building. The garage is built on pilings, and the work plan calls for excavation with the garage left in place. Due to limited funds, the Air Force plans to excavate the soil and store it in supersacks in an Air Force hangar adjacent to the Naval Arctic Research Laboratory airstrip. Staff has deferred approval of the work plan until the Air Force submits a plan and timetable for disposal of the soil. |
Tamar Stephens |
9/14/2006 |
Meeting or Teleconference Held |
Attended Barrow Restoration Advisory Board Meeting
|
Tamar Stephens |
10/9/2006 |
Document, Report, or Work plan Review - other |
Reviewed and approved Work Plan Addendum, Point Barrow LRRS, Alaska, Remediation of Contaminated Soils (August 2006). The work described in the work plan consists of excavation of soil adjacent to the west end of the garage contaminated with polychlorinated biphenyls (PCBs) resulting from migration of contamination from underneath the garage; construction of a berm to prevent further migration pending implementation of a final remedy at the Garage Site; and sampling of two tundra areas and three sections of roadway to assess whether PCB contamination has been spread to other areas of the facility. |
Tamar Stephens |
12/17/2006 |
Meeting or Teleconference Held |
Attended Barrow Restoration Advisory Board Meeting
|
Tamar Stephens |
3/8/2007 |
Meeting or Teleconference Held |
Attended Barrow Restoration Advisory Board Meeting
|
Tamar Stephens |
4/9/2007 |
Document, Report, or Work plan Review - other |
Reviewed and sent comments on draft Remedial Action and Site Characterization Report. |
Tamar Stephens |
8/30/2007 |
Document, Report, or Work plan Review - other |
Sent approval letter for final Remedial Action and Site Characterization Report. A total of 63.1 tons of soil contaminated with polychlorinated biphenyls (PCBs) were excavated to permafrost from the area adjacent to the west end of the garage. The excavation was covered with geofabric and covered with clean fill. A berm was constructed to prevent further migration of contamination from under the garage building. Confirmation sampling shows that PCBs remain on the southern portion of the excavation with concentrations up to 53 milligrams per kilogram (mg/kg), which exceeds the DEC cleanup level of 1 mg/kg. Sampling at two tundra areas showed PCBs are present above cleanup level (area immediately west of the excavation; and an area on the south side of the road from the garage). Multi-incremental sampling was used to evaluate three sections of roadway, two along the access road and one on the gas meter road between the garage and Imikpuk Lake, to determine whether road grading activities have resulted in the spread of PCBs to other portions of the facility. PCBs were not detected in the two access road sections. PCBs were detected on the gas meter road at 0.016 mg/kg, which is below the DEC cleanup level of 1 mg/kg. Surface water and sediment were sampled in Imikpuk Lake at the end of the gas meter road to assess for potential migration of PCBs to the lake due to road grading activities. No PCBs were detected in sediment and surface water samples. |
Tamar Stephens |
10/25/2007 |
Meeting or Teleconference Held |
Attended Barrow Restoration Advisory Board Meeting
|
Tamar Stephens |
12/11/2007 |
Risk Assessment Report Approved |
ADEC received the Final Risk Evaluation Report – Alaska North Slope Radar Installation Sites on November 6, 2007. This report meets the requirements of the ADEC Contaminated Sites Program Risk Assessment Procedures Manual, adopted by reference in 18 AAC 75.340. An approval letter was sent to Dave Cook, Program Manager HQ PACAF/A7NR, on December 10, 2007
This project identified categories of sites that are common on remote Air Force installations in the North Slope region of Alaska and developed conceptual site models and human health and ecological risk based screening levels for four of these categories: garage sites, fuel storage sites, non-fuel storage sites, and transformer sites. The project developed templates for conducting human health and ecological risk evaluations for these categories and performed a risk evaluation as a test case for one example of each type of site. The final report contains guidance on applying the process to other North Slope region sites. It may be used on a site-specific basis as a tool to assist in assessing potential risks posed by North Slope Air Force installation sites.
|
Tamar Stephens |
4/30/2008 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed. |
Tamar Stephens |
7/10/2008 |
Meeting or Teleconference Held |
Attended Barrow Restoration Advisory Board Meeting
|
Tamar Stephens |
10/13/2008 |
Meeting or Teleconference Held |
Attended Barrow Restoration Advisory Board Meeting. |
Tamar Stephens |
3/12/2009 |
Meeting or Teleconference Held |
Attended Barrow Restoration Advisory Board Meeting. |
Tamar Stephens |
9/17/2009 |
Meeting or Teleconference Held |
Attended Barrow Restoration Advisory Board Meeting. |
Tamar Stephens |
9/17/2009 |
Meeting or Teleconference Held |
Attended Barrow Restoration Advisory Board Meeting
|
Tamar Stephens |
11/19/2009 |
Document, Report, or Work plan Review - other |
Reviewed and sent comments on draft report: Initial Screening of Alternatives, Point Barrow Long Range Radar Station, Alaska. The report provides an initial screening of remedial alternatives for cleanup of contamination at four areas: Vehicle Fueling Station; Radome Area; Transformer Stand Area; Air Terminal Area Surface Water. |
Tamar Stephens |
12/3/2009 |
Meeting or Teleconference Held |
Attended Barrow Restoration Advisory Board Meeting
|
Tamar Stephens |
12/3/2009 |
Meeting or Teleconference Held |
Attended Barrow Restoration Advisory Board Meeting. |
Tamar Stephens |
2/13/2010 |
Document, Report, or Work plan Review - other |
Sent approval letter for final Initial Screening of Alternatives report. The report narrows down the possible alternatives to just a few for further evaluation. |
Tamar Stephens |
3/12/2010 |
Document, Report, or Work plan Review - other |
Reviewed and sent comments on draft Point Barrow Feasibility Study. |
Tamar Stephens |
3/18/2010 |
Meeting or Teleconference Held |
Attended Barrow Restoration Advisory Board Meeting
|
Tamar Stephens |
6/17/2010 |
Meeting or Teleconference Held |
Attended Barrow Restoration Advisory Board Meeting
|
Tamar Stephens |
8/6/2010 |
CERCLA FS |
Sent approval letter for final Point Barrow Feasibility Study. Feasibility study presents an evaluation of remedial alternatives and presents a preferred alternative for five areas: Air Terminal; Vehicle Fueling Station; Radome; Transformer Stand; and Vehicle Maintenance Facility (garage). Preferred alternative at the Vehicle Maintenance Facility is Soil excavation and off-site disposal. (Soil underneath the building will not be excavated at this time due to the difficulties accessing the soil and concerns about destabilizing the foundation of the building.) |
Tamar Stephens |
8/20/2010 |
CERCLA Proposed Plan |
Approval letter for final Proposed Plan for the Point Barrow Long Range Radar Station. DEC received a copy of the final Proposed Plan by e-mail on August 6, 2010. DEC previously reviewed a draft version of the Proposed Plan, and submitted comments on July 27, 2010. DEC received an electronic copy of the final version on August 6, 2010. Our review of the final version confirms that all DEC comments have been adequately incorporated; it is therefore approved. Attended public meeting in Barrow at which the Air Force presented the Proposed Plan. Public comment period from 8/12/2010 – 9/13/2010. |
Tamar Stephens |
10/13/2010 |
Meeting or Teleconference Held |
Attended Barrow Restoration Advisory Board Meeting
|
Tamar Stephens |
12/9/2010 |
Document, Report, or Work plan Review - other |
Reviewed and sent comments on 2011 Winter Work Plans for Environmental Restoration and Demolition Activities at Former NARL Facility and Point Barrow LRRS. The work planned for this winter consists of demolition and disposal of: one Quonset hut; Antenna poles, cables, and other building debris related to the receiver station and communications operation of NARL; Tanks 11, 1, 2, 28, 12, 22, 23, 24, 25, 26, 27 and 30 from main camp area; Antennas and support structures in the main camp area; Tanks 4, 5, 6, 7, 8, 9, and 10, and geotextile liner, from the Air Terminal area; Float Plane fuel dock at the Air Terminal area; easily accessible debris from the Air Terminal area storage yard (with the remainder to be removed in the summer); Transmission lines and utility poles from the Air Terminal area to the main camp area. |
Tamar Stephens |
3/17/2011 |
Meeting or Teleconference Held |
Attended Barrow Restoration Advisory Board Meeting
|
Tamar Stephens |
3/17/2011 |
Meeting or Teleconference Held |
Participated in two meetings. (1) Met wtih Air Force and Navy remedial project managers and their contractor for wintere demolition work for Air Force Clean Sweep and for the Navy Antenna Field. Contractor gave update on progress of winter demolition work. (2) Met with Air Force and Navy remedial project managers and discussed and agreed on placement of monitoring wells for long term monitoring of the Air Terminal site, and coordination between Air Force, Navy, and DEC for monitoring activities. Contaminated surface water at the Air Force site results from migration of contaminated active zone water from the adjacent Navy site. |
Tamar Stephens |
4/18/2011 |
Document, Report, or Work plan Review - other |
Sent comments from DEC and the Department of Law on draft Record of Decision. |
Tamar Stephens |
8/2/2011 |
CERCLA ROD Approved |
Final ROD signed July 29, 2011 by Col. Robyn Burk, USAF Commander, 611th Air Support Group, and on August 2, 2011 by John Halverson, Environmental Program Manager, Federal Facilities Section, Contaminated Sites Program, ADEC. |
Tamar Stephens |
9/7/2011 |
Document, Report, or Work plan Review - other |
Approved final Work Plan Addendum for Summer Field Activities – Environmental Restoration and Demolition Activities at the Former NARL Facility and Point Barrow. This is a joint project between the Navy and the Air Force. The specific cleanup activities that will be conducted at this site under this work plan addendum are: (1) Excavation and offsite disposal of polychlorinated biphenyl (PCB) contaminated soil from the Point Barrow Long Range Radar Station (LRRS) Vehicle Maintenance Facility, Radome, and Transformer Stand areas; Excavation and offsite disposal of xylene-contaminated soil at the Point Barrow LRRS former Vehicle Fueling area; Installation of four well points and sampling of active zone water at these four well points plus a pre-existing well point at the Air Terminal area; Removal of exposed debris at the Naval Arctic Research Laboratory Antenna Field; Completion of demolition and debris removal at the Point Barrow LRRS that was begun during this past winter; and Hazardous Material Survey of the Air Force Hangar at the Point Barrow LRRS Air Terminal area. |
Tamar Stephens |
6/5/2013 |
Site Visit |
DEC Staff conducted a Site Visit to observe current conditions at the site. The demolition areas were clean and contoured. Observed the newly installed monitoring well point locations on Air Force property near the South Depression. |
Dennis Shepard |
9/11/2014 |
Update or Other Action |
Carnahan and Debenham attended Barrow Restoration and Advisory Board Meeting in Barrow. |
John Carnahan |
10/3/2014 |
Update or Other Action |
Project oversight changed from Shephard to Carnahan. |
John Carnahan |
11/24/2014 |
Institutional Control Update |
Reviewed 2014 Annual IC Inspection and Surface Water Monitoring Summary report for site work completed June 23, 2014 at Point Barrow LRRSA. A new IC notification sign was installed at NE corner of Air Terminal Pond to replace missing sign. Other IC's appeared to be functioning. No pond water quality violations detected indicating free from petroleum impacts. Measured concentrations were ND or well below the AK Water Quality Standards for TAH and TAqH. No substantive comments and report is approved. |
John Carnahan |
2/2/2015 |
Document, Report, or Work plan Review - other |
Approval for 2014 Long Term Management Report for IC Control Inspection and Surface Water Monitoring at Pt. Barrow LRRS (FInal). No substantive comments provided on draft. |
John Carnahan |
3/25/2015 |
Document, Report, or Work plan Review - other |
Provide comments to AF on Draft Remedial Action - Construction Activities Report documenting 2014 field work in removing PCB and xylene contaminated soil. |
John Carnahan |
4/22/2015 |
Update or Other Action |
Carnahan and Debenham attended Barrow Restoration and Advisory Board Meeting in Barrow. |
John Carnahan |
5/7/2015 |
Document, Report, or Work plan Review - other |
Provide response to comments to AF on Draft Remedial Action - Construction Activities Report DEC comments documenting 2014 field work in removing PCB and xylene contaminated soil. Final report will be submitted with comments incorporated. |
John Carnahan |
6/9/2015 |
Site Characterization Report Approved |
Provide approval letter for Remedial Action-Construction Report, Point Barrow Long Range Radar Station, Barrow, Alaska – May 2015. Future activities will complete removal of PCB contaminated material at SSOO2. |
John Carnahan |
6/25/2015 |
Update or Other Action |
Debenham attended Barrow Restoration and Advisory Board Meeting in Barrow. |
John Carnahan |
8/28/2015 |
Site Characterization Workplan Approved |
Approved 2015 RA-C workplan addendum. |
John Carnahan |
10/7/2015 |
Meeting or Teleconference Held |
Review CA14-16 and CA16-18 JEPs. Complete State Performance Reporting.
|
John Carnahan |
5/25/2016 |
Document, Report, or Work plan Review - other |
Review and provide comments on DRAFT Remedial Action - Construction Report for multiple locations at SS002, that encompassed final removal of PCB and hydrocarbon contamination. |
John Carnahan |
8/25/2016 |
Document, Report, or Work plan Review - other |
Provide approval for FINAL Supplemental Work Plan, 2016 Remedial Actin Operations, Land Use/Institutional Control, Point Barrow LRRS, Sites SS002 and SS003, August 2016. |
John Carnahan |
9/29/2016 |
Meeting or Teleconference Held |
Barrow RAB Meeting held. Debenham in attendance. |
John Carnahan |
9/20/2017 |
Document, Report, or Work plan Review - other |
Approval for FINAL Supplemental Work Plan, 2017-2018 Remedial Action Operations, Land Use/Institutional Control, Point Barrow LRRS, Sites SS002 and SS003, September 2017. |
John Carnahan |
1/31/2018 |
Document, Report, or Work plan Review - other |
Provide comments to LTM/LUC inspection reporting for multiple sites. |
John Carnahan |
10/1/2019 |
Update or Other Action |
ADEC reviewed "Pre-Draft Technical Project Report, 2019 Remedial Action Operations,
Land Use/Institutional Control Point Barrow LRRS, Sites SS002 and SS003"
Dated August 2019 and the "Draft Technical Project Report, 2019 Remedial Action
Operations, Land Use/Institutional Control, Point Barrow LRRS, Sites SS002 and SS003"
Dated September 2019. The reports document the annual inspection of institutional controls at Point Barrow Long Range Radar Site's SS002 and SS003. The reports document that the land use control (LUC) notification signs are missing at the Vehicle Maintenance Facility (SS002) and the Air Terminal Area Pond (SS003). |
Rachael Petraeus |
7/25/2020 |
CERCLA SI |
DEC approved the “Final Perfluorooctanoic Acid, Perfluoroctane Sulfonate, and Perfluorobutane Sulfonate Site Inspections, Uniform Federal Policy-Quality Assurance Project Plan Work Plan, Six Remote Radar Stations, Alaska” dated July 2020. This work plan was prepared by United States Air Force to guide investigation of the potential presence of perfluorooctanoic acid (PFOA), perfluorooctane sulfonate (PFOS), and perfluorobutane sulfonate (PFBS) at six remote radar sites in Alaska through the sampling of surface water, groundwater, soil and sediment. Sampling is planned for Cape Newenham, Cape Romanzof, Indian Mountain, Point Barrow, Sparrevohn and Tatalina, |
Melinda Brunner |
6/20/2022 |
Document, Report, or Work plan Review - other |
ADEC approves the 2021 Long-Term Management Report Point Barrow Long Range Radar Site Site SS002. This report detailed the annual inspection activities conducted in August 2021 to assess the status of the institutional controls/land use controls (IC/LUC) at Site SS002. This included a visual inspection of the building for notification signage and observation of the soil cap below the structure for disturbances. One notification sign was replaced at the northwest corner of the site and a new sign was installed on the southeast corner of the building and a small section of the perimeter fence requires repair. |
Sarah Mutter |
8/3/2022 |
Document, Report, or Work plan Review - other |
Review and provide comments on DRAFT Second Five-Year Review (FYR) for CERCLA Site SS002 and Second Periodic Review for SS003 at Point Barrow Long Range Radar Station, Alaska dated April 2022, which was received on July 26, 2022. This report details the second CERCLA FYR for SS002 and second discretionary periodic review for SS003 at Point Barrow LRRS and selected remedies to ensure that remedies selected in the 2011 Record of Decision have been implemented, are performing effectively, and continue to be protective of human health and the environment. |
Sarah Mutter |
11/15/2022 |
Document, Report, or Work plan Review - other |
DEC received and commented on the Revised Draft Land Use Control Management Plan (LUCMP) for the Pacific Air Forces Regional Support Center Remote Installations |
Sarah Mutter |
2/8/2023 |
CERCLA ROD Periodic Review |
DEC reviewed and approved the Final Second Five-Year Review for CERCLA Site SS002 and Second Periodic Review for SS003. This report details the review of the selected remedies for SS002 and SS003 to ensure remedies selected are being implemented effectively and are performing as expected, remaining protective of human health and the environment. The protectiveness determination for SS002 was found to be protective and the selected remedy was found to be functioning as intended. The protectiveness determination for SS003 was concluded as 'will be protective' pending installation of IC signage and the filing of a NAUL. |
Kelly Walker |
4/5/2023 |
Long Term Monitoring Workplan or Report Review |
DEC completed review of the 2022 Long-Term Management Report for SS002. This report detailed the annual inspection of institutional controls/land use controls in place at SS002, Vehicle Maintenance Facility. Site conditions remained largely unchanged. One sign was repaired on the southeast corner of the building. All other IC signs were intact, legible and in good shape. The perimeter fencing was in general good condition with the exception of a section on the southwest corner that needed repair. |
Kelly Walker |
12/11/2023 |
Long Term Monitoring Workplan or Report Review |
DEC reviewed and approved the "2023 Long-Term Management Report" for the Point Barrow LRRS Site SS002. This report detailed the annual inspection of the institutional control/land use controls (IC/LUCs) in place at the Vehicle Maintenance Facility-SS002. Fencing was repaired along the northeast and northwest corners of SS002. Signage was observed to be in place and functioning. |
Kelly Walker |
8/15/2024 |
Long Term Monitoring Workplan or Report Review |
DEC reviewed and approved the "Work Plan, Long-Term Management, Point Barrow LRRS, Site SS002 and Site SS003" for the Point Barrow LRRS. This work plan details the 2024 institutional control/land use control (IC/LUC) inspections and maintenance at SS002. Collection of surface water samples will also be conducted at SS003. |
Kelly Walker |