Action Date |
Action |
Description |
DEC Staff |
1/1/1990 |
Site Added to Database |
Added prior to 5/1/90. POL, transformers, containerized PCBs, and soils contaminated with POL, PCBs and pesticides. |
Former Staff |
9/6/1991 |
Update or Other Action |
(Old R:Base Action Code = FI - Field Inspection (General)). Staff visited site and noted approximately 500 full drums, about 10% leaking, open leaking transformers with possible PCB contamination, dozens of surface spills with staining, and large amounts of miscellaneous solid waste and barrel dumps contents unknown. |
Cindy Thomas |
2/26/1992 |
Update or Other Action |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). Staff sent letter to Corps of Engineers requesting an emergency removal action at the Umiat Staging Area during the summer of 1992 due to confirmed presence of leaking transformers. Planned 1992 action has been delayed until 1996. |
Laura Noland |
4/14/1992 |
Site Ranked Using the AHRM |
Initial ranking. |
Former Staff |
6/24/1992 |
Update or Other Action |
(Old R:Base Action Code = RPL2 - Site Information Request Letter). ADEC staff sent PRP-CS Database Notification Letter to PRP requesting update and additional environmental information concerning the contaminated site. RP responded on 8-24-92 with update and stated COE will award contract to perform site investigation this year and would forward updated information at its completion. |
Jeff Peterson |
7/31/1992 |
Notice of Violation |
Issued an NOV to Corps on 7/21/92. Corps responded on 8/18/92, stating no funding available for removal. ADEC hired Northwest EnvironService, Inc. for emergency cleanup and packing of transformers, beginning 10/21/92. Final report (dated) ADEC. 1992 of October cleanup in file. |
Ed Armstrong |
5/27/1993 |
Update or Other Action |
(Old R:Base Action Code = CORR - Correspondence (General)). ADEC staff sent letter to Trans-Arctic Ltd. in Seattle on Umiat emergency containment and overpacking of leaking transformers. State hired contractor, since COE had no funding. George Matz requested information concerning situation in October 1992. COE proposed cleanup FY94. |
Marcus Ortelee |
6/9/1993 |
Update or Other Action |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). ADEC staff received and reviewed plan for removal /disposal of PCB liquid, POL soil and debris. Requested sampling for soil/water where POL drums located and empty drum areas. |
Marcus Ortelee |
6/9/1993 |
Update or Other Action |
(Old R:Base Action Code = CORR - Correspondence (General)). ADEC staff sent letter concerning COE's removal/action at site with questions on map and Colville River at site. Requested sampling of soil/water after drum dump removal(3 discrete samples with one from center of dump area). |
Marcus Ortelee |
6/23/1993 |
Update or Other Action |
(Old R:Base Action Code = CORR - Correspondence (General)). ADEC staff's 2nd response to Mr. Matz of Trans-Arctic on Umiat cleanup, via fax from Jim Pound 6-21-93. Matz lost maintenance at Umiat to DoD. |
Marcus Ortelee |
7/19/1993 |
Update or Other Action |
(Old R:Base Action Code = CORR - Correspondence (General)). COE letter indicates limited field sampling to be done in 1994. |
Bob Couch |
12/27/1993 |
Update or Other Action |
(Old R:Base Action Code = CORR - Correspondence (General)). COE gave plans and specs and announced contract had been awarded to Hart Crowser Inc. Clay Romain, Senior Engineer, fax # (206)328-5581 |
Bob Couch |
1/24/1994 |
Site Ranked Using the AHRM |
Reranked. |
Former Staff |
2/7/1994 |
Update or Other Action |
(Old R:Base Action Code = RI - Remedial Investigation). Received Work Plan Remedial Investigation Umiat Air Force Station, Umiat, Alaska and Site Safety and Health Plan Umiat Air Force Station Umiat, Alaska. |
Bob Couch |
4/7/1994 |
Meeting or Teleconference Held |
Corps of Engineers District Office in Anchorage met with Corps people and Contractor for final design conference. |
Bob Couch |
12/15/1994 |
Update or Other Action |
(Old R:Base Action Code = RDRA - Remedial Design / Remedial Action). Included removal and disposal of PPCB liquids (350 gallons), transformers, and PCB soils (8 cubic yards), removal and disposal of POL liquids (21,145 gallons) and POL containers (900 drums), and removal of three transformers, 53 gallons of PCB liquid, and 1.2 cubic yards of PCB-contaminated soil. |
Former Staff |
9/14/1995 |
Update or Other Action |
Draft Risk Assessment Work Plan received. |
Tamar Stephens |
10/19/1995 |
Update or Other Action |
(Old R:Base Action Code = MP - Management Plan (CERCLIS)). Draft Community Action Plan received |
Tamar Stephens |
11/20/1995 |
Proposed Plan |
Engineering Evaluation/Cost Analysis received; addresses treatment/removal options for PCB contaminated soil. |
Tamar Stephens |
11/28/1995 |
Update or Other Action |
(Old R:Base Action Code = CORR - Correspondence (General)). Staff sent letter of comment after reviewing Risk Assessment Work Plan: risk assessment will need to add groundwater testing, and will need to address risks of elevated lead levels. |
Tamar Stephens |
1/22/1996 |
Update or Other Action |
Received Risk Assessment Work Plan for Umiat Air Force Station. |
Tamar Stephens |
2/1/1996 |
Update or Other Action |
Community Relations/Public Involvement and Response Plan, Former Umiat Air Force Station, Umiat, Alaska, Contract Number DACA85-93-D-0009, Delivery Order Number 0030, received June 21, 1996. |
Tamar Stephens |
5/31/1996 |
Update or Other Action |
(Old R:Base Action Code = RI - Remedial Investigation). Draft Remedial Investigation Work Plan, Phase II. |
Tamar Stephens |
7/1/1996 |
Site Characterization Workplan Approved |
(Old R:Base Action Code = RI - Remedial Investigation). Phase II Remedial Investigation Work Plans, former Umiat Air Force Station, Umiat, Alaska, Contract Number DACA85-93-D-0009, Delivery Order Number 40, received 8/5/1996. |
Tamar Stephens |
11/26/1997 |
Update or Other Action |
Approved technical memorandum reporting results of dioxin testing. |
Tamar Stephens |
1/2/1998 |
Update or Other Action |
Received work plan for interim removal action for PCBs at main gravel pad. |
Tamar Stephens |
1/30/1998 |
Update or Other Action |
Received final Feasibility Study. |
Tamar Stephens |
2/13/1998 |
Update or Other Action |
Approved Risk Assessment addendum for fish tissue sampling from seasonal slough and Colville River |
Tamar Stephens |
3/20/1998 |
Meeting or Teleconference Held |
Attended public meeting in Anaktuvuk Pass. |
Tamar Stephens |
4/15/1998 |
Meeting or Teleconference Held |
Attended Barrow RAB meeting. A public meeting in Nuiqsut was also held on this date; ADEC staff unable to attend due to being at Barrow RAB. |
Tamar Stephens |
5/12/1998 |
Update or Other Action |
Received technical memorandum update to Human Health and Ecological Risk Assessment regarding fish tissue sampling. |
Tamar Stephens |
5/13/1998 |
Update or Other Action |
Received Phase 3 Remedial Investigation: slough sediment sampling, initial sampling at Navy test wells. |
Tamar Stephens |
5/26/1998 |
Meeting or Teleconference Held |
Review conference with Corps of Engineers regarding risk assessment technical memorandum and Phase 3 RI. |
Tamar Stephens |
5/26/1998 |
Site Characterization Report Approved |
Approved Phase 3 Remedial Investigation. |
Tamar Stephens |
5/26/1998 |
Update or Other Action |
Approved Risk assessment technical memo. |
Tamar Stephens |
7/16/1998 |
Meeting or Teleconference Held |
Barrow RAB meeting. |
Tamar Stephens |
8/1/1998 |
Update or Other Action |
Site visit. Accompanied Corps of Engineers and their contractor. Toured airstrip, main gravel pad, landfill, and accessed Navy test wells 2 and 5 and seasonal slough by boat. |
Tamar Stephens |
8/18/1998 |
Meeting or Teleconference Held |
Barrow RAB meeting. |
Tamar Stephens |
1/12/1999 |
Update or Other Action |
Sent review comments on draft risk assessment work plan addendum regarding fish tissue sampling. |
Tamar Stephens |
1/14/1999 |
Meeting or Teleconference Held |
Barrow RAB meeting. |
Tamar Stephens |
3/24/1999 |
Update or Other Action |
Received final Remedial Action Report on interim action to remove PCB contaminated soil at main gravel pad. Removal was completed in summer of 98. |
Tamar Stephens |
4/8/1999 |
Meeting or Teleconference Held |
Barrow RAB meeting. |
Tamar Stephens |
5/18/1999 |
Meeting or Teleconference Held |
Attended review conference with Corps of Engineers on 1998 Field Investigation Work Plan. |
Tamar Stephens |
5/18/1999 |
Update or Other Action |
1998 Field Investigation report approved upon satisfactory resolution of ADEC comments during review conference. Report addresses sampling at Navy test wells, sediment and surface water sampling at seasonal slough, and fish tissue sampling. |
Tamar Stephens |
6/10/1999 |
Update or Other Action |
Reviewed conceptual design technical memorandum for treatment of POL soil at Airstrip and Main Gravel pad. |
Tamar Stephens |
7/5/1999 |
Meeting or Teleconference Held |
Barrow RAB meeting. |
Tamar Stephens |
8/23/1999 |
Update or Other Action |
Reviewed and approved addendum to 1998 field investigation work plan, to fill data gaps. |
Tamar Stephens |
10/15/1999 |
Meeting or Teleconference Held |
Site project meeting with Corps of Engineers and BLM at Elmendorf AFB regarding upcoming removal project at Wells 2 and 5. |
Tamar Stephens |
11/4/1999 |
Meeting or Teleconference Held |
Barrow RAB meeting. |
Tamar Stephens |
12/1/1999 |
Update or Other Action |
Sent letter to James Baker (COE) regarding how to request a waiver or modification of stockpiling requirements. Large volume of soil from Test Wells 2 and 5 may not fit on gravel pad if 100 foot limit from surface water is required. |
Tamar Stephens |
1/10/2000 |
Update or Other Action |
Draft EE/CA for removal action at Test Wells 2 and 5: reviewed and sent comments on draft EE/CA. |
Tamar Stephens |
1/11/2000 |
Meeting or Teleconference Held |
Participated in review conference for draft EE/CA and draft risk assessment work plan addendum (re fish tissue sampling). |
Tamar Stephens |
1/12/2000 |
Update or Other Action |
Sent comments on draft risk assessment work plan addendum to use recent fish data for updating risk assessment. |
Tamar Stephens |
1/28/2000 |
Update or Other Action |
Reviewed Environmental Assessment and Finding of No Significant Impact for removal action at NPR-4 Test Wells Numbers 2 and 5. Sent letter of concurrence with EA/FONSI conclusions. |
Tamar Stephens |
2/9/2000 |
Update or Other Action |
Reviewed Health Consultation Interim Report. Prepared by Alaska Department of Health and Social Services, Office of Epidemiology. Evaluates data for PCBs and pesticides in fish. |
Tamar Stephens |
3/28/2000 |
Update or Other Action |
Received 1999 Field Investigation Technical Memorandum. |
Tamar Stephens |
8/3/2000 |
Update or Other Action |
Received Geophysical Survey and Engineering Analysis - NPR-4 Pad Wells Numbers 2 and 5. Report provides support information for proposed removal action at this location. This report does not require ADEC review. |
Tamar Stephens |
9/18/2000 |
Update or Other Action |
Received draft Umiat Well Remediation Work Plan, for Wells 2 and 5 removal action. |
Tamar Stephens |
9/27/2000 |
Update or Other Action |
Completed review and sent comments on draft Umiat Well Remediation Work Plan, Wells 2 and 5. Additional details on several items requested. |
Tamar Stephens |
10/13/2000 |
Meeting or Teleconference Held |
Interagency meeting called by DEC, with ADOT&PF, ADF&G, DNR, and BLM, to work on resolving agency issues to facilitate removal action at Wells 2 and 5. Unresolved issue at end of meeting was water source for ice road. |
Tamar Stephens |
12/13/2000 |
Risk Assessment Report Approved |
Completed review of draft Human Health and Ecological Risk Assessment Work Plan for NPR-4 Test Wells Numbers 1, 7 and 8. Sent comments to Corps of Engineers. |
Tamar Stephens |
3/20/2001 |
Meeting or Teleconference Held |
Stephens attended public meeting in Nuiqsut re ATSDR's fish consultation on whether fish near Umiat have harmful levels of PCBs from exposure to slough. |
Tamar Stephens |
5/3/2001 |
Update or Other Action |
Provisional approval of work plan: Technical Memorandum, 2001 Phase I Field Activities, Umiat, Alaska. Work Plan describes plans for construction of soil stockpiles to hold soil planned for excavation from Test Wells 2 and 5 pad. |
Tamar Stephens |
5/3/2001 |
Update or Other Action |
Waiver of Separation Distance between Stockpile Site and Surface Water, Umiat Main Gravel Pad. Approved by Section Manager Jennifer Roberts; approval letter sent by Tamar Stephens. Insufficient room on pad to site stockpiles without the waiver. |
Tamar Stephens |
6/6/2001 |
Meeting or Teleconference Held |
Stephens attended Nuiqsut RAB meeting. |
Tamar Stephens |
7/17/2001 |
Update or Other Action |
Review of draft Colville River Sampling and Analysis Work Plan for the Former Umiat Air Force Station, Umiat, Alaska. Plan is to use passive samplers to detect PCB cogeners and DDTs in river, and sample fish, for seven reaches from upstream of Umiat, in slough, and downstream to Nuiqsut. |
Tamar Stephens |
7/27/2001 |
Update or Other Action |
Approval of work plan, Final Technical Memorandum, 2001 Phase I Field Activities, Umiat, Alaska, and approval of Amendment 1 to June 2001 Final Technical Memorandum. Amendment changes size and layout of stockpile pads. |
Tamar Stephens |
8/5/2001 |
Update or Other Action |
Approval of Work Plan: Colville River Sampling and Analysis Work Plan for the Former Umiat Air Force Station, Umiat, Alaska. Action added by Sarah Riddle. |
Tamar Stephens |
8/9/2001 |
Update or Other Action |
DEC received notification letter regarding PCB item found at Umiat landfill; Approval of Remedial Action Plan. Item was an electrical device found on July 2, 2001 site visit; found leaking PCB oil. Removal is for item, associated soil, and for several batteries, battery parts, and associated soil from surface of landfill. |
Tamar Stephens |
9/25/2001 |
Update or Other Action |
Reviewed and commented on draft report: Technical Memorandum – Unit C Landfill Debris Removal, Umiat, Alaska, Draft, September 2001. Report describes removal of PCB item, batteries, and associated soils. |
Tamar Stephens |
10/17/2001 |
Meeting or Teleconference Held |
Stephens attended Nuiqsut RAB meeting. |
Tamar Stephens |
12/19/2001 |
Update or Other Action |
Review of draft Work Plan - 2002 Phase II Field Activities, Umiat, Alaska, November 2001. Comments made and review letter sent. Phase II is for construction of ice road, plugging and abandoning Wells 2 and 5, excavating contaminated soil from the well pad, and transporting to stockpile area at Umiat main gravel pad. |
Tamar Stephens |
12/21/2001 |
Update or Other Action |
Approved report: Technical Memorandum – Hazardous Waste Removal from Umiat. Unit C Landfill, Umiat, Alaska. Report described removal of PCB item, batteries, and associated PCB and lead contaminated soil.
Reviewed report: Phase I Report – Installation of Contaminated Soil Stockpiles, Excavation of Lead-Contaminated Soil, and Delineation of Well Pads 2 and 5, Umiat, Alaska. Requested more information on removals of lead contaminated soil, and managing different soil types in stockpiles. |
Tamar Stephens |
1/10/2002 |
Meeting or Teleconference Held |
Stephens attended Nuiqsut RAB meeting. |
Tamar Stephens |
3/18/2002 |
Cleanup Plan Approved |
Approval of final Work Plan – Phase II Field Activities, Umiat, Alaska. Phase II is for plugging and abandoning Wells 2 and 5, excavating contaminated soil at Wells 2 and 5 pad, and transporting to stockpile facility at main gravel pad. |
Tamar Stephens |
4/2/2002 |
Update or Other Action |
Umiat Phase II Work Plan – Approval of additional stockpile at Main Gravel Pad. Action added by Sarah Riddle. |
Tamar Stephens |
4/11/2002 |
Meeting or Teleconference Held |
Stephens attended Nuiqsut RAB meeting. |
Tamar Stephens |
6/4/2002 |
Update or Other Action |
Review of Operations Plan – Thermal Treatment of Contaminated Soil at NPR-4 Well Nos. 2 and 5, Umiat, Alaska. Approved with some restrictions. |
Tamar Stephens |
6/5/2002 |
Update or Other Action |
Review of draft Work Plan Addendum – 2002 Phase III Field Activities, Umiat, Alaska. Submitted detailed comments on additional requirements. |
Tamar Stephens |
6/11/2002 |
Update or Other Action |
Review of “Umiat Phase III Proposal to Manage Brine Contamination of Well Pad Gravels and Soils,” and “Sample Collection and Screening Procedure for Sodium Chloride Impacted Soils at Umiat,” received by fax on May 17, 2002. Reviewed by Tamar Stephens. Submitted comments and identified additional information needed in order to approve. |
Tamar Stephens |
6/12/2002 |
Update or Other Action |
Review of “Conceptual Plan for Managing Drill Mud/Cuttings at Umiat, Alaska.” Action added by Sarah Riddle. |
Tamar Stephens |
6/26/2002 |
Update or Other Action |
Approval to use Wastewater General Permit No. 0240-DB001 at Umiat. |
Tamar Stephens |
6/27/2002 |
Notice of Violation |
Compliance Advisory: Discharge of non-domestic wastewater without a permit. Letter sent by Jennifer Roberts to document violations and to request specific corrective actions within 30 days. |
Jennifer Roberts |
7/9/2002 |
Meeting or Teleconference Held |
Stephens participated in Nuiqsut RAB meeting by teleconference (unable to travel due to illness). |
Tamar Stephens |
8/2/2002 |
Update or Other Action |
Review and Approval of Work Plan – 2002 Phase III Activities, Umiat, Alaska, Interim Final, July 2002. |
Tamar Stephens |
9/3/2002 |
Update or Other Action |
Approval of Sample Collection and Screening Procedure for Sodium Chloride in Petroleum Impacted Soils at Umiat. |
Tamar Stephens |
9/4/2002 |
Update or Other Action |
Approval of Request for Modification of Wastewater General Permit No. 9640-DB001, Umiat, Alaska. |
Tamar Stephens |
9/5/2002 |
Update or Other Action |
Review of draft Evaluation of PCBs and DDTs in the Colville River, Former Umiat Air Force Station. |
Tamar Stephens |
9/13/2002 |
Cleanup Level(s) Approved |
Correction to BTEX cleanup levels for thermally treated soil in Work Plan – Phase III Field Activities, Umiat, Alaska. The soil is being treated to “Level A” cleanup levels. |
Tamar Stephens |
10/5/2002 |
Meeting or Teleconference Held |
Stephens attended Nuiqsut RAB meeting. |
Tamar Stephens |
10/14/2002 |
Update or Other Action |
Approved PCB Soil Sampling Procedure. Approval sent in e-mail. Sampling plan is for screening stockpiled soil for presence of PCBs following discovery of PCBs in crude removed from Well 5, and concern that previous characterization of soil for PCBs was not adequate. About 100 samples taken in grids and lifts throughout stockpiles. |
Tamar Stephens |
11/1/2002 |
Meeting or Teleconference Held |
Stephens participated in review conference in Anchorage for report: "Draft Evaluation of PCBs and DDTs in the Colville River". |
Tamar Stephens |
11/13/2002 |
Meeting or Teleconference Held |
Stephens met with Corps of Engineers staff to scope out key elements for development of Proposed Plan. |
Tamar Stephens |
12/3/2002 |
Meeting or Teleconference Held |
Nuiqsut RAB meeting - Stephens participated via teleconference (Unable to travel due to knee injury.). This was a special meeting to work with the RAB on development of the Proposed Plan. |
Tamar Stephens |
1/9/2003 |
Update or Other Action |
Since formation of Nuiqsut RAB, Barrow RAB does not officially provide comment on Umiat. However, Umiat is a regular topic of discussion at the Barrow RAB meetings. DEC regularly attends Barrow RAB meetings, provides information and answers questions on Umiat at every meeting. Since formation of Nuiqsut RAB, Stephens attended Barrow RAB meetings on: 2/24/00, 5/4/00, 1/18/01, 4/13/01, 11/18/01, 2/21/02, 9/19/02, 11/7/02. |
Tamar Stephens |
1/14/2003 |
Meeting or Teleconference Held |
RAB meeting in Nuiqsut. Stephens participated by teleconference. Umiat topics were upcoming work, and progress on developing a proposed plan. Corps confirmed they have funding to treat the remainder of the soil at Umiat, plus 1000 yards of soil from the pads, this coming summer. Expect to finish sometime in September. Proposed plan pre-draft should be ready in 2-3 weeks, and Corps will want to arrange a special meeting with RAB for the purpose of going through the PP for RAB input before preparing one for public comment. |
Tamar Stephens |
2/4/2003 |
Update or Other Action |
Approved Long-term Soil Stockpile Plan, which provides for weekly monitoring and necessary maintenance on soil stockpiles for soil from Wells 2 and 5 until treatment is completed on the soil. |
Tamar Stephens |
2/7/2003 |
Site Number Identifier Changed |
Changed the Region from 36 to 31 and Sequence Number from 25 to 11. |
Former Staff |
4/8/2003 |
Meeting or Teleconference Held |
Stephens attended Nuiqsut RAB meeting. |
Tamar Stephens |
7/15/2003 |
Meeting or Teleconference Held |
Stephens attended RAB meeting in Nuiqsut. |
Tamar Stephens |
7/16/2003 |
Meeting or Teleconference Held |
Stephens attended Public Meeting in Nuiqsut to present proposed plan for several Umiat sites. |
Tamar Stephens |
10/28/2003 |
Meeting or Teleconference Held |
Stephens attended RAB meeting in Nuiqsut. |
Tamar Stephens |
6/22/2004 |
Cleanup Plan Approved |
Approved draft work plan for summer 2004 to treat remaining soil from Test Wells 2 and 5 using Hot Air Vapor Extraction. Stockpiles also contain petroleum contaminated soil from the main gravel pad and airstrip apron that were used as base material, and that were excavated as hot spots. |
Tamar Stephens |
10/13/2004 |
Meeting or Teleconference Held |
Stephens attended RAB meeting in Nuiqsut. |
Tamar Stephens |
1/26/2005 |
Update or Other Action |
Stephens reviewed, sent letter with comments, 2003 Phase III Remedial Action Report. This report describes work performed at Umiat during summer of 2003, including treatment of 20,006 tons of petroleum-contaminated soil by low temperature thermal desorption, excavation of 435 tons of soil from the Umiat gravel pads, and site restoration activities. |
Tamar Stephens |
9/10/2007 |
Update or Other Action |
Tamar Stephen (DEC) conducted a site visit by helicopter along with Corps of Engineers project manager Mary Jemin and project engineer Bob Haviland. |
Tamar Stephens |
6/16/2008 |
Exposure Tracking Model On Hold |
This is a facility-wide record. Eash individual site identified within the facility has a separate entry on the data base and is separately ranked on the ETM. |
Tamar Stephens |
7/28/2011 |
Site Visit |
John Halverson (DEC), Lisa Giest, Craig Scola, Dee Ginter and Aaron Shewman (Corps of Engineers) and Chris Darrah (Shannon and Wilson) conducted a site inspection at the Umiat FUDS. At the landfill area scattered drums, a few lead acid battery plates, metal debris were exposed on the ground surface above the known disposal areas. The spring flooding in 2011 was significant and the sand/cobble cover in the slough and along the shoreline had shifted from last year. Corps staff conducted survey transects along the slough and landfill area documenting site conditions and looking for hazardous materials. No obvious hazardous materials were found other than the battery plates and potential material in drums (drums that were breached appeared to contain soil) but not all could be inspected.
Inspection at Test Well #9 revealed some ponded water in the lowest areas excavated adjacent to the surface water drainage. Excavated and exposed soils up-slope were dry, contained small to large cracks, and showed some sign of surface erosion. The site was evaluated for further site characterization and cleanup options.
Inspection photos and summary are in the project file.
|
John Halverson |
8/20/2013 |
Meeting or Teleconference Held |
Melody Debenham attended RAB meeting in Nuiqsut. |
Melody Debenham |
9/3/2015 |
Update or Other Action |
General Umiat folder - site specific activities tracked on individual projects. Umiat Test Well sites, Main Gravel Pad, Umiat Lake, Umiat Landfill and Seasonal Slough. |
John Carnahan |
12/1/2016 |
Meeting or Teleconference Held |
CS managers participate in the annual FUDS site management action plan meeting. The purpose of the is to collaborate with FUDS management on site progress and prioritization for all of the formerly used defense sites. FUDS prioritization is based on risk, congressional interest, state input and proximity to other sites on the prioritization list. FUDS has increased environmental restoration funding in Alaska for the 2017 and 2018 field seasons to meet National goals for site progress. |
Darren Mulkey |
5/11/2017 |
Meeting or Teleconference Held |
Umiat LF meeting held at DNR offices. Agenda located in file and meeting minutes forthcoming. Discussed elements of successful LF project, including cleanup criteria. New location for LF proposed. |
John Carnahan |
6/19/2017 |
Site Visit |
Site visit to inspect multiple locations with USCOE representatives. Hike to site locations and inspect current status and recovery. |
John Carnahan |
4/17/2019 |
Update or Other Action |
Restoration advisory board (RAB) meeting held in Utqiagvik. Update provided on Umiat and others. |
John Carnahan |
11/13/2019 |
Meeting or Teleconference Held |
DEC staff participated in the Restoration Advisory Board meeting in Nuiqsut, where the U.S. Army Corps of Engineers discussed planned activities for Umiat FUDS sites. |
Melinda Brunner |
11/25/2020 |
Meeting or Teleconference Held |
DEC staff met with FUDS staff to discuss the
Applicable or Relevant and Appropriate Requirements (ARARs) for the Test Well 7 Feasibility Study (FS), with a specific focus on the applicability of UECA as an ARAR. |
Jamie McKellar |
12/30/2020 |
CERCLA FS |
DOCUMENT RECEIVED: Final 2020 Umiat Test Well #7 Feasibility Study, Formerly Used Defense Site, Umiat Alaska (USACE, December 2020). DEC and FUDS will schedule a meeting in late January/early February for further discussion of ARARs. |
Jamie McKellar |
7/21/2023 |
Meeting or Teleconference Held |
Meeting held with USACE, ADEC, BLM, and Paragon-Central Joint Venture Team to discuss the initial remedial design phase of the landfill relocation project for the former Umiat Air Force Station. Items discussed included contract requirements, remedial design framework, and the upcoming site visit and landfill inspection. |
Kelly Walker |
8/15/2023 |
Site Visit |
DEC, BLM, USACE, and contracting staff conducted the annual landfill inspection at Umiat AFS August 15-16. Staff walked the footprint of the former landfill area to inspect condition of cap and to note uncovered debris and status of former monitoring wells. Additionally, the proposed borrow area was inspected and evaluated for possible backfill useage during restoration phase of the project. Staff also walked/hiked to the proposed monofill locations for the inert debris excavated from the former landfill. |
Kelly Walker |
11/15/2023 |
Meeting or Teleconference Held |
The November 2023 Regional Advisory Board meeting was held to discuss the remedial design phase of the Umiat Landfill Removal FUDS Project. In attendance were members of the public, BLM, DEC, DNR, DOT, USACE, ASRC, Kuukpik Corporation, and North Slope Borough. The overall status of the project was discussed in addition to upcoming RAB meeting dates were discussed. Meeting minutes will be compiled and posted publicly upon completion. |
Kelly Walker |
2/27/2024 |
Meeting or Teleconference Held |
DEC, USACE, and Paragon-Jacobs JV traveled to Nuiqsut, AK on February 27 for the Spring 2024 Umiat Regional Advisory Board meeting. This meeting discussed the progress of the remedial design phase of the landfill removal and site investigation at the location of the former Umiat AFS. Field work is expected to start Fall of 2024. In attendance were members of the public, BLM, DEC, DNR, DOT, USACE, ASRC, Kuukpik Corporation, and North Slope Borough. |
Kelly Walker |
8/21/2024 |
Meeting or Teleconference Held |
DEC staff attended the Umiat Landfill Partnering Meeting in Fairbanks on August 21-22. Also in attendance were representatives from FUDS, Paragon Central JV, BLM, DOT&PF, DEC Solid Waste Program, ASRC, Kuukpik Corporation, North Slope Borough, Inupiat Community of the Arctic Slope (ICAS), and a community representative from Utqiagvik. The intent of this meeting was to develop a strong partnership among the many stakeholders of the Umiat Landfill Removal Project and to ensure communication pathways are well laid out. |
Kelly Walker |
8/27/2024 |
Site Characterization Workplan Approved |
DEC reviewed and approved with comments the "Remedial Design Investigation Work Plan" for the Umiat Landfill at the former Umiat AFS. The work plan details collection of soil samples from test pits and borehole pits within the known dump area, Colville River channel, and areas surrounding the known landfill area to further characterize the nature and extent of contamination and waste within the landfill; sampling of material handling and borrow areas for the presence of hazardous substances; evaluation of current conditions in areas proposed for the inert waste monofill; and evaluation of treatment options for both contaminated soil and water. The work plan also details additional activities intended to inform future mobilizations, monofill design and infrastructure needs. |
Kelly Walker |