Site Report: Gerstle River Exp. Area Drum Disposal Area

Site Name: Gerstle River Exp. Area Drum Disposal Area
Address: ~34 Miles East of, Delta Junction, Delta Junction, AK 99737
File Number: 141.38.030
Hazard ID: 867
Status: Cleanup Complete
Staff: No Longer Assigned, 9074655229 dec.icunit@alaska.gov
Latitude: 63.793000
Longitude: -145.034000
Horizontal Datum:

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

While completing a site assessment for UXO at the Gerstle River Expansion Area, a drum dump was discovered adjacent to the Administration compound for the Gerstle River Test Site. The drum dump consisted of several mounds of buried drums with several abandoned drums present on the surface. Further assessment work determined that many of the drums had leaked fog-oil (similar to diesel fuel) to the surrounding soil. The Drum Dump was renamed as Drum Disposal Area consisting of the Drum Mound Area and the Stained Soil Area characterized by a faint diesel odor and no vegetation growth. This is a formally used defense site. Cleanup conducted by the US Corps of Engineers.

Action Information

Action Date Action Description DEC Staff
11/17/2000 Site Added to Database Fort Greely Gerstle River Test Site, Reckey 198933X902501, was split into this and three other sites. Former Staff
12/1/2000 Interim Removal Action Approved An interim removal of drums and contaminated soil was completed Summer 1999. Awaiting report. Greg Light
3/5/2001 Update or Other Action File number corrected from 170.38.025 to 141.38.030. Mitzi Read
11/7/2002 Interim Removal Action Approved Interim removal complete reported in “1999-2000 Remedial Investigation Removal Action Gerstle River Expansion Area.” Proposed Plan pending. Greg Light
1/15/2003 Update or Other Action Site is expected to be closed upon receipt of a decision document from the US Corps of Engineers. Greg Light
4/2/2004 Meeting or Teleconference Held DEC staff Tamar Stephens and Greg Light met with Corps of Engineers staff Shah Alam and Bob Hazlett and Department of Natural Resources Staff Robert Layne. (DNR) Purpose: (1) to discuss draft Closure Report for Administration Area and Borrow Pits 1 and 3, and to discuss process to reach closure. DEC staff agreed that site meets requirements for closure. Process will consist of (1)finalize Closure Report such that it can be used for a decision document; (2) Corps will prepare a Proposed Plan and release it for public comment (with DEC approval); (3) following public comment, Decision Document will be finalized and signed by DEC and Corps of Engineers. Site will be formally closed when Decision Document is signed. Tamar Stephens
5/5/2004 Update or Other Action ADEC staff Tamar Stephens reviewed and sent comments on draft Closeout Report - Gerstle River Expansion Area Non-Ordnance Sites. Tamar Stephens
5/25/2004 Update or Other Action Site visit by DEC staff Tamar Stephens and Corps of Engineers staff Shah Alam, Bob Hazlett, and David Westerman. Tamar Stephens
3/4/2005 Update or Other Action Reviewed Proposed Plan from USACE that recommends NFRAP for GREA. Agree with plan and will present findings in Delta Junction RAB on March 9, 2005. Mike Jaynes
3/11/2005 Meeting or Teleconference Held Attended GREA Restoration Advisory Board (RAB) Meeting in Delta Junction. Discussed results of Borrow Pit 3 work and Corps presented the Proposed Plan for closure of HTRW sites. Meeting to present status of site to public scheduled for June, 2005. Next RAB meeting scheduled for October 5, 2005. Mike Jaynes
8/4/2005 Meeting or Teleconference Held Attended Army Corps presentation of Chemical Weapons (CWM) and munitions (MMRP) reports at City Council Meeting and Open House. Both reports are now open for 30 day review by State Agencies and the public. Also spoke with reporter from Delta News and Fairbanks News-Minor. Will be reviewing reports and submit official comments in conjunction with DNR. Mike Jaynes
3/7/2007 Meeting or Teleconference Held Zachary Richter and Colin Craven represented ADEC at Gerstle River RAB Meeting. Closure of the Sites at GREA was discussed. Decision Documents are currently being reviewed. Decided to have another RAB to present the final closure documents. Zachary Richter
3/20/2007 Exposure Tracking Model Ranking Initial ranking completed on ETM. Zachary Richter
3/28/2013 Cleanup Complete Determination Issued ADEC signed "Declaration of Project Closure Decision for DERP-FUDS Gerstle River Expansion Area, Non-Ordnance Sites". Remedial actions removed waste and soil contamination at the site. Confirmation soil samples identified DRO exceeding most stringent cleanup levels at 14 ft bgs in the center of the former excavation. Subsequent soil borings did not identify significant soil contamination beneath the former excavation. Therefore a thin layer of DRO contaminated soil remains between 14-15 bgs beneath the former excavation. ADEC has determined that the residual DRO contaminated soil does not pose a threat to human health, public safety, or the environment. Guy Warren

Contaminant Information

Name Level Description Media Comments
DRO < Method 2 Most Stringent Soil Soil contaminated with DRO/RRO was excavated from the site. A thin layer with DRO concentrations up to 3,100 ppm was identified beneath the former excavation.

Control Type

Type Details
No ICs Required

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.

No associated sites were found.