Action Date |
Action |
Description |
DEC Staff |
10/25/1983 |
Update or Other Action |
(Old R:Base Action Code = RAU - Remedial Actions Underway (General)). Excavation of gravel next to hotel and new shop building. Samples obtained. No analyses received by DEC. |
Former Staff |
10/25/1983 |
Update or Other Action |
(Old R:Base Action Code = FI - Field Inspection (General)). Water sample obtained by B. Fristoe. 17 ppb trihalomethanes detected. |
Former Staff |
7/6/1988 |
Notice of Violation |
Issued by B. Fristoe for unreported spills. |
Former Staff |
11/21/1988 |
Update or Other Action |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). QA project plan for sampling. |
Former Staff |
1/1/1989 |
Update or Other Action |
Cleanup of gross spillage by Alaska Technical Services, Inc. |
Former Staff |
12/20/1990 |
Site Ranked Using the AHRM |
Initial ranking. |
Former Staff |
11/20/1992 |
Site Number Identifier Changed |
Old Reckey 1989360902526. Reckey changed to reflect new region. |
Former Staff |
4/16/1993 |
Update or Other Action |
(Old R:Base Action Code = SA1 - Phase I Site Assessment (General)). Phase I audit submitted to department. |
Former Staff |
11/1/1993 |
Update or Other Action |
(Old R:Base Action Code = SA1R - Phase I SA Review (CS/LUST)). Review completed by staff. |
Former Staff |
1/5/1994 |
Site Number Identifier Changed |
Reckey number changed from 89400902526 to reflect region number change. |
Scott Rose |
12/14/1994 |
Update or Other Action |
(Old R:Base Action Code = SA2 - Phase II Site Assessment (General)). Phase II report submitted to the department on 12/14/94. |
Former Staff |
1/6/1995 |
Preliminary Assessment Approved |
Site assessment performed by Alaska Technical Services, Inc. |
Former Staff |
2/23/1998 |
Site Added to Database |
QA\QC revealed that this action was not previously added. |
Bill Petrik |
7/16/1998 |
Update or Other Action |
RFP issued for remediation of Lot 6 based upon March 1997 Phase II assessment commissioned by ADOT. Confirmation Sampling for Lots 5A and 5B to be accomplished at the same time. |
John Mazzitello |
6/2/1999 |
Cleanup Plan Approved |
ADEC approved corrective work plan entitled "Work Plan Corrective Action ADOT&PF Airport Lease Block 70, Lot 6" by Shannon and Wilson, dated May 1999. The plan describes a corrective action which includes designing a multi-phase bioremediation program to treat approximately 10,000 cubic yards of POL contaminated soil at the lease site. The remedial system is estimated to take 5 years and includes baseline data collection, interim sampling/monitoring, and status reports. |
John Mazzitello |
8/21/2001 |
Site Characterization Workplan Approved |
Staff approved the site characterization workplan - work will be done under BP Merger agreement. |
Jim Frechione |
5/30/2002 |
Site Characterization Report Approved |
Received site characterization report which describes activiites site characterization acitivites conducted at Block 70, Lots 5A, 5B, and Deadhorse Hotel pad (Lot 6).
The biocell which was constructed in 1999 on Lot 6, was disassembled and spread on Lot 6. The biocell was designed to remediate existing contaminated soil below grade and additional contaminated soil piled above grade. Samples were collected from the above grade section in June 2000 which indicated that the soil met cleanup levels. The biocell was dismantled in August 2001 and the soil was spread over the pad. Below grade soil was left in place.
Soil samples indicated that the applicable cleanup levels were achieved with the exception of the following area:
•Soil sample DH-12 in the southeastern portion of the former biopile at 711 mg/kg DRO.
|
Linda Nuechterlein |
8/24/2004 |
Update or Other Action |
Final CA Report submitted for source removal effort and landfarming at Sea Air Motive which was conducted under the NS Charter Agreement. A landfarm was constructed at the former Deadhorse Hotel Pad for treatment of petroleum contaminated soil which was transported from the Sea Air pad after source removal/excavation.. |
Linda Nuechterlein |
12/15/2005 |
Conditional Closure Approved |
Based on the information provided to date, no further remedial action is required for Deadhorse Airport Block 70 pad which includes Lease Lot 6. This decision evaluated the contaminant concentrations remaining on site and determined there is no risk to human health or the environment. |
Linda Nuechterlein |
12/15/2005 |
Institutional Control Record Established |
An institutional control is established on the ADEC database to record that there are areas on the pad where hazardous substance contamination may remain above the most stringent ADEC cleanup levels as reported in the "Phase II Environmental Site Assessment" dated March 7, 2002 for Deadhorse Airport Block 70, Lease Lots 5A, 5B, and 6. Any proposal to transport soil off site requires ADEC approval in accordance with 18 AAC 75.325(i).
Site closure (without conditions) can be achieved when soil sampling confirms that all soil meets the most stringent Method Two migration to groundwater cleanup levels established in 18 AAC 75, Table B2.
|
Linda Nuechterlein |
4/4/2012 |
Institutional Control Compliance Review |
IC review conducted and staff name changed from Nuechterlein to IC Unit.
|
Evonne Reese |
7/29/2024 |
Institutional Control Compliance Review |
IC compliance review completed on this date. An IC reminder letter was e-mailed to the landowner. The next review will be in five years’ time. |
Gaige Robinson |