Action Date |
Action |
Description |
DEC Staff |
12/31/1990 |
Site Added to Database |
Petroleum and possible solvent contaminant. |
Former Staff |
12/31/1990 |
Update or Other Action |
(Old R:Base Action Code = FI - Field Inspection (General)). Site inspection on 10/10/90. Sent Certified letter to Edmunson/FDIC 12/11/90. Waiting for response |
Former Staff |
2/28/1991 |
Update or Other Action |
(Old R:Base Action Code = FI - Field Inspection (General)). Joint inspection with RP Contractor conducted 2/28/91. Inspected interior of 2 vacant units in building. Noted floor drain in one and cut in concrete floor in other. Need to be inspected for floor drains and assessment performed. |
Former Staff |
12/9/1992 |
Site Ranked Using the AHRM |
Insufficient comments provided to allow proper audit. |
Former Staff |
7/26/1993 |
Update or Other Action |
(Old R:Base Action Code = SA1R - Phase I SA Review (CS/LUST)). |
Former Staff |
3/14/1994 |
Update or Other Action |
(Old R:Base Action Code = SA1R - Phase I SA Review (CS/LUST)). Additional assessment or remediation activities required. |
Former Staff |
4/5/1995 |
Update or Other Action |
(Old R:Base Action Code = RPL3 - RP Determined and Action Request). The Department requests that you respond to the Department's letter of May 14, 1994. |
Mike Krieber |
12/5/1995 |
Update or Other Action |
(Old R:Base Action Code = RPL3 - RP Determined and Action Request). Floor drain cleanup plan status request. By 1/15/96 a written verification that the cleanup plan approved by ADEC 3/14/94 will be implemented and a written schedule for the cleanup project and the name of the consulting firm overseeing the needed activities will be needed. |
Mike Krieber |
6/20/1996 |
Cleanup Plan Approved |
(Old R:Base Action Code = CAPA - Corrective Action Plan). Reviewed a Corrective Action report. The department will not require any further assessment nor cleanup action related to floor drains in bays 1, 2, and 3. A treatment plan addressing remaining contamination and excavated soils with a time schedule is needed for department review and written approval. |
Mike Krieber |
8/22/1996 |
Update or Other Action |
(Old R:Base Action Code = RAPA - Remedial Action Plan Approval). Reviewed a Stockpile Treatment and Disposal Plan and Stockpile Sample Results. The department requests a time schedule be submitted addressing cleanup at this property. |
Mike Krieber |
1/3/1997 |
Update or Other Action |
Reviewed a Post-Treatment Sample Results Report. Sample results for the floor drain contamination are below regulatory levels. Therefore, the floor drain aspect of this site requires no further action by ADEC nor RP, however, unacceptable contamination levels remain for surface spills as well as heating oil tank related spills. The site will be totally closed when these 2 major remaining issues are addressed to the department's satisfaction. |
Mike Krieber |
5/15/2006 |
Update or Other Action |
Site transferred from Frechione to Sundet. |
Aggie Blandford |
6/6/2006 |
Update or Other Action |
Site transferred from Sundet to Horwath. |
Aggie Blandford |
7/11/2006 |
GIS Position Updated |
Using Figure 1 from the Phase II Environmental Audit Lot 7, Meadow Creek Subdivision, from HartCrowser, dated August 1993, in conjunction with the Matanuska Susitna Borough, and TopoZone Pro, entered the coordinates for this site. Metadata includes USGS Topo Map 1:24k/25K, TopoZone Pro Street Maps, on a Medium Size Map, View Scale 1:10,000, Coordinate Datum WGS84. High degree of confidence in accuracy of location. |
Alyce Hughey |
7/12/2006 |
Update or Other Action |
Project manager changed from Paul Horwath to Don Fritz, per Paul Horwath. |
Alyce Hughey |
8/1/2006 |
Update or Other Action |
Reviewed file to determine site status. Drafted and sent a letter was sent to the RP advising of new project manager, and requesting an update on activities that have occurred since 1997 or a work plan to address outstanding issues. |
Don Fritz |
1/14/2008 |
Site Characterization Workplan Approved |
Approved 1/14/08 Restoration Science and Engineering work plan for additional assessment work at project site |
Don Fritz |
2/8/2008 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed. |
Don Fritz |
1/4/2010 |
Update or Other Action |
Phone conversation with Butch Moore regarding this site. Butch is interested in purchasing the site. Wanted to know if site was closed. Told him that they had undertaken additional assessment work, but that I had some concerns with the work done, and they were supposed to do additional groundwater monitoring from the wells not sampled. |
Don Fritz |
11/3/2011 |
Update or Other Action |
Staff reviewed the Final Site Assessment for Surface Stained Areas at Lot 7, Meadow Creek Subdivision, Big Lake, Alaska, submitted by Kent Scheler (Restoration Science & Engineering). A letter identifying comments and concerns regarding this report and the site in general were sent to the responsible party on January 28, 2010. |
Alyce Hughey |
11/16/2011 |
Update or Other Action |
Site transferred from Don Fritz to Peter Campbell per Paul Horwath. |
Alyce Hughey |
6/25/2013 |
Update or Other Action |
Letter sent from ADEC to the current owner requesting a work plan for additional sampling of monitoring wells and the site drinking water well. |
Peter Campbell |
8/31/2017 |
Update or Other Action |
the State of Alaska Department of Transportation and Public Facilities has acquired this property and part of a right of way expansion road project. the State is continuing environmental work and is planning on submitting a work plan to sampling existing monitoring wells. |
Peter Campbell |
4/4/2018 |
Update or Other Action |
After reviewing historical reports (1993 Phase II Environmental Audit) it appears that there are three Class V injection wells on the site. ADOT has been contacted and referred to the EPA for the closure and decommissioning of the floor drains as the building is demolished. |
Peter Campbell |
6/27/2018 |
Document, Report, or Work plan Review - other |
Review and approve the Work Plan for Groundwater and Well Decommissioning. The plan calls for sampling three site monitoring wells, and decommissioning the wells pending lab results. |
Peter Campbell |
8/26/2019 |
Document, Report, or Work plan Review - other |
Review the Summary of Environmental Site Activities (May 26, 2019) letter that details the results of site work. The three site monitoring wells were not located after the building was demolished. The site drinking water well was sampled for contaminants of concern. The well was 74 feet deep and no contaminants were detected. Floor drains from the former shop were found to be cemented in and no trace of Class V injection wells were found. The site appears to be eligible for closure. |
Peter Campbell |
4/24/2020 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 71944 name: Meadow Creek Subdivision |
Peter Campbell |
4/28/2020 |
Cleanup Complete Determination Issued |
|
Peter Campbell |