Action Date |
Action |
Description |
DEC Staff |
6/8/1992 |
Site Added to Database |
|
Former Staff |
1/5/1993 |
Site Ranked Using the AHRM |
Surface Water Exposure Index Value changed from site managers form. |
Former Staff |
10/11/1993 |
Update or Other Action |
(Old R:Base Action Code = CORR - Correspondence (General)). Sampling and analysis plan approved as part of the clean closure request process for soils landspread on airstrip. |
Former Staff |
9/25/2000 |
Site Characterization Workplan Approved |
Site characterization work plan in support of method 3 closure approved |
Don Fritz |
5/21/2004 |
Update or Other Action |
File number assigned and entered into the Fileroom DB and CS DB. |
Alyce Hughey |
7/26/2005 |
GIS Position Updated |
Using Figure 1 from Beluga River Field Stockpile Sampling Activities Report, from James M. Montgomery, dated August 1992, in conjunction with TopoZone Pro, entered the coordinates for this site. Metadata include No Topo Basemap, TopoZone Pro Street Map, Black and White Aerial Photo, on a Medium Size Map, View Scale 1:10,000, Coordinate Datum NAD83. High degree of confidence in accuracy of location. |
Alyce Hughey |
2/3/2006 |
Update or Other Action |
File name changed from ARCO BRU 224-13 Well Site Diesel to Beluga River 224-13 on 2-3-06 per Don Fritz. |
Alyce Hughey |
6/19/2008 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed. |
Don Fritz |
2/4/2011 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 71968 name: ARCO BRU 224-13 Well Site |
Bianca Reece |
11/16/2011 |
Update or Other Action |
Site transferred from Don Fritz to Peter Campbell per Paul Horwath. |
Alyce Hughey |
3/20/2019 |
Workplan Requested |
In 1991 hydrocarbon contaminated soil from a diesel spill and crude oil contamination were identified. A closure request was submitted to our office in 1995. It appears from the environmental record that one monitoring well remains on site. Long term monitoring was established in 1997, but records do not indicate that sampling was conducted.
Please verify the number of wells on site and prepare a work plan for the sampling of the well or wells.
|
Peter Campbell |
4/20/2021 |
Workplan Requested |
Reiterate requirement for work plan from 2019. |
Peter Campbell |
4/21/2021 |
Workplan Requested |
In 1991 hydrocarbon contaminated soil from a diesel spill and crude oil contamination were identified. A closure request was submitted to our office in 1995. It appears from the environmental record that one monitoring well remains on site. Long term monitoring was established in 1997, but records do not indicate that sampling was conducted. Please verify the number of wells on site and prepare a work plan for the sampling of the well or wells.
|
Peter Campbell |
6/30/2021 |
Document, Report, or Work plan Review - other |
2021 Site Characterization and Groundwater Sampling Work Plan ADEC Approval |
Peter Campbell |
1/25/2022 |
Document, Report, or Work plan Review - other |
The 2021 Interim Groundwater Monitoring Report recommends sampling the remaining monitoring well an additional time and moving the site towards closure. We have requested Hilcorp provide an assessment of the site, including groundwater flow characteristics, including a narrative site history. Is the remaining well in a location that is representative of historical groundwater impacts? What are the current operation conditions at the pad? Evaluate the site and determine if additional assessment and drilling is necessary to close the site with confidence. |
Peter Campbell |
8/22/2023 |
Meeting or Teleconference Held |
Install two new temporary groundwater monitoring wells to determine contaminant concentrations (if any) and to establish a groundwater flow direction. Collect groundwater samples from the two new temporary wells and from existing well, 224-13-2. If needed, one additional temporary well will be installed to collect downgradient groundwater data from the southern portion of the pad. |
Peter Campbell |
8/30/2023 |
Document, Report, or Work plan Review - other |
2022 Groundwater Monitoring Report review and approval |
Peter Campbell |
9/13/2023 |
Update or Other Action |
Work plan review. The new proposed downgradient well should be installed down gradient of the well head. The new proposed downgradient well should be installed down gradient of the 224-13 well head. It appears there may be a wetland to the southwest of the pad. If there is surface water present, capture a surface water elevation and a surface water sample for TAH, TAqH. |
Peter Campbell |
8/26/2024 |
Long Term Monitoring Workplan or Report Review |
2024 Groundwater Monitoring Work Pan Approval with a request to move a downgradient monitoring well further north to capture impacts from a likely source, the Pad wellhead. |
Peter Campbell |