Primary Reason for Site Visit

Primary Reason specifies the primary reason for the visit to the public water system (there may be several reasons why a visit was made). The primary reason may be any one of the following:
SNSV Sanitary Survey FENF Formal Enforcement
SSVF Sanitary Survey Follow-up IENF Informal Enforcement
SHAZ Sanitary Hazards Investigation CPEV Comprehensive Performance Evaluation (CPE)
TRTP Water Treatment Plant Site Visit CNST Construction Inspection
TRNG Training
OM Operation and Maintenance
LABC Laboratory Certification NEED Needs Survey
EMRG Emergency Assistance RCDR Record Review
ENGR Engineering Determination/ Advice/Plan Review SITE Site Inspection
INVG Investigation (Complaint/ Violation/etc.) SRCE Source Water Inspection
LABI Laboratory Inspection LOCD Locational Data Collection
INFI Informal System Inspection WHPP Wellhead Protection Program
OTHR Other SRF State Revolving Fund
PRMT Permit (Qualification/ Review/Compliance) CAPD Capacity Development Assessment
RSCH Regularly Scheduled WSHD Watershed Evaluation
SMPL Sample Collection XCON Cross Connection Inspection/Investigation
TECH Technical Assistance (Non-specific) PUBH Public Hearing
VAEX Variance/Exemption Related