Site Report: Arctic Utilities, Inc., Nana, TDX

Site Name: Arctic Utilities, Inc., Nana, TDX
Address: Deadhorse Airport, Lot 2A, Block 301, Deadhorse, AK 99734
File Number: 300.38.157
Hazard ID: 4027
Status: Cleanup Complete - Institutional Controls
Staff: IC Unit, 9074655229 dec.icunit@alaska.gov
Latitude: 70.197222
Longitude: -148.459167
Horizontal Datum:NAD83

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

The subject site located on the Deadhorse Airport (under lease from DOTPF) has been used as an electrical generating facililty and oil field service support area since the 1970's. It has reportedly been impacted by petroleum hydrocarbons over the years from the storage and use of diesel fuel product. NANA Oilfield Services, Inc. also operated a maintenance shop on site that may have contributed to the contamination. The NANA pad (Lot 2, Block 301) was split into Lot 2A and 2B. Lot 2A was the electric power generator site and transferred to TDX North Slope Generating Inc. in January 2003.

Action Information

Action Date Action Description DEC Staff
12/8/2003 Update or Other Action DEC letter to NANA Development Corp regarding the initial site assessment conducted by EMI (dated September 2003). There were areas of soil contamination identified that exceeded Arctic Zone cleanup levels (for xylene). The assessment also did not address all areas of the site. Jim Frechione
12/15/2003 Site Added to Database DRO and BTEX. Jim Frechione
12/15/2003 Site Ranked Using the AHRM Initial ranking. Bill Petrik
3/26/2004 Update or Other Action NANA consultant (Travis Peterson Environmental) submit corrective action plan and additional site assessment work plan for DEC approval. Jim Frechione
4/8/2004 Cleanup Level(s) Approved DEC approves 18 AAC 75.341 soil cleanup levels for the Arctic Zone. Two areas on the site exceeded xylene levels and were identified for excavation and removal. In addition, other areas of the site need to be investigated. Jim Frechione
4/12/2004 Update or Other Action Travis Peterson Environmental clarified sample locations at the site in response to DEC comments. There were to be 8 borings under the power plant and 7 borings under the shop buillding. Jim Frechione
5/12/2004 Update or Other Action Travis Peterson Enviromental requests use of historic sample data to be used to characterize soil that is to be excavated and transported for thermal treatment. DEC approved the use of the September 2003 EMI report information for this purpose. Jim Frechione
12/15/2004 Update or Other Action TDX North Slope Generating (current operator of the electric generating plant) submit a November 2004 Limited Soil Sampling Report by EMI. The report provided soil sample data from under the generator building. Test holes were dug (approximately 1 foot bgs) and field screened at 8 locations. Thrre samples were submitted for lab analysis with contamination ranging 43 - 718 mg/kg GRO; 2910 - 8580 mg/kg DRO; 441 - 769 mg/kg RRO; and 0.98 - 36.2 mg/kg xylene. TDX wanted this data included as "existing baseline" contamination from NANA's prior use for the purpose of future environmental liability. Jim Frechione
2/10/2005 Update or Other Action Travis/Peterson Cleanup Summary Report received & 90 - 100 cy of material was excavated from areas B-10 & D-11. Soil around the power plant foundation, transformer platform & generator fans could not be removed due to proximity near structures. TPECI installed 15 boreholes along the perimeter of the buildings. Letter will be sent to RP to request a site diagram to scale showing limits of excavations, depth of excavations and location of surface water in proximity to pad. Linda Nuechterlein
7/29/2005 GIS Position Updated GIS Position Update action was not added during site intake. Lat/long were verified and converted to NAD83 using TopozonePro with a 1:50,000 scale and a large map. A 1:24K/25K Series topo base map was used. Sarah Cunningham
8/29/2005 Update or Other Action (3/2/2005) Travis/Peterson provided information regarding the limits/depth of excavation and the location of the surface water in proximity to the areas of contamination. Sarah Cunningham
9/20/2005 Conditional Closure Approved The cleanup actions to date at this site have served to remove the majority of contaminated soil that exceeds the 18 AAC 75.341 cleanup levels. As a result of this action, ADEC has determined that no further remedial action is required at this time. This decision is based on the information provided to date that indicates the contaminant concentrations remaining on site do not pose a risk to human health or the environment. Linda Nuechterlein
9/20/2005 Institutional Control Record Established The following institutional controls will be recorded in the ADEC database: (1) hazardous substance contamination remains on site above the established cleanup (or target) levels. Soil samples were collected from the limits of the excavation in areas B10 and D11 and from soil borings around the buildings. The contaminant concentrations remaining on site ranged from 2140 to 5730 mg/kg DRO and 87 to 173 mg/kg xylene. (2) Any proposal to transport soil off site requires ADEC approval in accordance with 18 AAC 75.325(i). Linda Nuechterlein
4/3/2012 Institutional Control Compliance Review IC review conducted and staff name changed from Nuechterlein to IC Unit. Evonne Reese
10/30/2013 Institutional Control Update ICs were removed in error from this site during an IC review, therefore the site was reopened and ICs were put back in place. This is the reason for the archived IC record. Evonne Reese
6/12/2015 Institutional Control Update Scheduled to send an IC reminder letter. Evonne Reese
6/22/2015 Institutional Control Update An IC reminder letter was issued to the responsible party on this date. Kristin Thompson
7/1/2015 Institutional Control Update The IC reminder letter was returned as undeliverable and resent to an updated address on this date. Kristin Thompson
6/19/2018 Institutional Control Compliance Review IC compliance review conducted. Closure/IC Details updated. Kristin Thompson
7/29/2020 Institutional Control Compliance Review IC Reminder sent to the landowner and lessee of the property on this date. Site is under a 5 year compliance review period, next review due in 2025. Cascade Galasso-Irish

Contaminant Information

Name Level Description Media Comments
DRO Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil
BTEX > Human Health/Ingestion/Inhalation Soil

Control Type

Type Details
Other The database notation IC Type is no longer available when this QC adjustment was made.

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site. Standard condition.
Excavation / Soil Movement Restrictions If excavation of soils should occur in the future, the ADEC must be notified and the soil must be characterized and managed following regulations applicable at that time.
When Contaminated Soil is Accessible, Remediation Should Occur When remaining contaminated soils become accessible, they must be characterized and managed following regulations applicable at that time.
Movement or use of contaminated material (including on site) in a manner that results in a violation of the water quality standards is prohibited (18 AAC 70) Standard condition.
Periodic Review ADEC will conduct a review of site conditions every five years.

No associated sites were found.