Skip to content

APDES Electronic Notice of Intent ( eNOI)

DEC has developed an eNOI system for electronic entry and submittal of the forms to apply for coverage under the APDES storm water permits. Operators may file their applications either using the eNOI system or submit paper forms to DEC at the address listed below.

To enter the APDES eNOI system, please select the link on the button below.


We currently have the following APDES storm water permits available online:

    • Construction General Permit (CGP)
      • CGP Notice of Intent (NOI)
      • CGP Notice of Termination (NOT)
      • CGP NOI modification
    • Multi-Sector General Permit (MSGP)
      • MSGP Notice of Intent (NOI)
      • MSGP No Exposure Certification
      • MSGP Report
    • Excavation Dewatering General Permit
      • Notice of Intent (NOI)
      • Notice of Termination (NOT)
    • Hydrostatic General Permit
      • Notice of Intent (NOI)
      • Notice of Termination (NOT)
    • Aquifer Pump Test (Mineral Mining & Development only) General Permit
      • Notice of Intent (NOI)
      • Notice of Termination (NOT)

Note: At this time the Multi-Sector General Permit - Notice of Termination (NOT) and NOI modification forms are not yet available thru the eNOI system; paper copies may be mailed or emailed to DEC at the address listed below.

Prior to entering the APDES eNOI system we recommend the following steps to make it easier to use the system.

  • Read the permit (available on the Construction General Permit page)
  • Read the instructions that go with the NOI or NOT form for the permit for which you are applying for coverage (available on the APDES Storm Water Forms page)
  • Read the Step-by-Step instructions on how to file the eNOI or eNOT (available in the Quick Links box to the right)
  • Fill out the paper NOI or NOT before entering the system so you do not need to look up the information while you are entering data into the system
  • If you have questions about the storm water permit, see the Frequently Asked Questions (FAQ) on the page for each permit (FAQs, Construction General Permit)
  • In order to electronically sign any online application you will be required to use your validated myAlaska account. See DEC Water Validation for E-Signature Guidance document for more information.

To enter the APDES eNOI system, please select the link on the button below.


Paper Submittal of Forms

Please submit paper forms to:

      • Alaska Department of Environmental Conservation
      • Division of Water
      • 555 Cordova Street, 3rd Floor
      • Anchorage, AK 99501
      • Office: 907-451-2881 | Email: DEC.Water.WQPermit@alaska.gov

Contact

For more information on APDES eNOI, please contact