Hydrostatic and Aquifer Pump Test NOI Flow Chart
Start
Aquifer Pump Testing In support of mineral mining development and exploration (Part 1.3.2.1)
1. Where do you discharge?
Land
2. Are the aquifer pump testing discharges:
- Greater than or equal to 30,000 gpd, or
- Within a 1,500 feet of a permit defined “DEC Identified Contaminated Site," or
- Within a 1,500 feet of a “DEC Identified Contaminated Groundwater Plume."
Water
Key
Discharge to:
Waters of the U.S.
Land
Submit an NOI and Certified BMP Plan in accordance with Parts 2.2, 2.2.8, and 2.2.9 of the permit to receive discharge authorization.
Water
Yes
No
Start
Hydrostatic Related
1. Where do you discharge?
Land
No NOI Submittal is required as the discharge is authorized in accordance to Part 4.0, Control Measures and Part 5.0, Limitations, Inspections, and Monitoring Requirements of the permit.