MS4 Submittal Requirements
Permanent Storm Water Management Controls (Outside MS4):
An operator installing permanent storm water management controls and where the project is located outside of an APDES permitted MS4, must submit information required by the DEC at least thirty (30) calendar days prior to filing the NOI for the project. The operator must receive the DEC’s written reply prior to the commencement of construction activities.
Permanent Storm Water Management Controls (Inside MS4):
An operator installing permanent storm water management controls and where the project is located inside the area of an APDES permitted MS4 must submit information required by the MS4 operator for the project and must receive the MS4 operator’s approval prior to the commencement of construction activities. Check with the respective MS4 operator for their particular submittal requirements (see below for contact information). In addition, each MS4 has particular SWPPP Submittal Requirements.
Contact Information for Operators of construction activity within MS4
- Municipality of Anchorage
- Public Works Department
- 4700 South Elmore Rd.
- P.O. Box 196650
- Anchorage, AK 99519-6650
- ADOT&PF
- Construction and Operations, Central Region
- 4111 Aviation Ave.
- P.O. Box 196900
- Anchorage, AK 99519
- Port of Anchorage
- Operations and Maintenance
- 2000 Anchorage Port Road
- Anchorage, AK 99501
- Storm Water Lead
- 673rdCES/CEIEC
- 724 Quartermaster Drive
- JBER, AK 99506
- Fairbanks North Star Borough
- Department of Public Works
- P.O. Box 71267
- Fairbanks, AK 99707
- City of Fairbanks
- Engineering Division
- 800 Cushman St.
- Fairbanks, AK 99701
- City of North Pole
- Department of Public Works
- 125 Snowman Lane
- North Pole, AK 99705
- Water Quality Program
- US Army Garrison, Alaska DPW, Environmental Division
- 3023 Engineer Place
- Fort Wainwright, AK 99703